Land North East of Gorswen, Llanfanfawr, Builth Wells, LD2 3PL Data via plota.co.uk

P/26/0330/FUL - Full planning permission Under Consultation

Proposal

Erection of a rural enterprise dwelling with package treatment plant, access and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 May 2026
✓
Validated
18 Jun 2026
Decision
Expected by 13 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 113.

Site constraints 3

Nutrient neutrality catchment: River Wye
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
Full planning permission
Postcode
LD2 3PL
Received
29 May 2026
Validated
18 Jun 2026
Ward
Llanafanfawr
Parish
Llanafanfawr
Case officer
Show
Target decision
13 Aug 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 113, past the statutory target. 81% of agricultural works in Powys are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 11357 days past the 56-day target
65%decided within 8 weeks
90%approved
160decided in the last year

Plota live figures for agricultural works decided by Powys in the last twelve months, from validation. Powys decision record →

Public comments

9comments received
9 neutral

Last counted 7 Oct 2026

Read the comments on the council site ↗