Scotland Bridge Road Footbridge Data via plota.co.uk
Proposal
The existing 1.7-metre-wide Scotland Bridge Road Footbridge has reached the end of its maintainable life, and routine maintenance is no longer a viable long-term option to ensure public safety. Replacement is urgently required to prevent closure of this vital pedestrian link, which is heavily relied upon by local schools, residents, and businesses. As part of this project, we will be replacing the current 1.7m wide path with a 3 wide footbridge. To meet Surreys commitment for accessibility and active travel, on all projects, we must consider how we can improve routes for community links. The current 1.7m wide path is too narrow for shared use which means disabled access, cyclist and prams are frequently required to stop or give way. Widening the footbridge to a 3m will greatly improve this situation and provide a safer environment for all users. There are five oak trees located near the existing structure. The project team has carefully evaluated these trees to minimise ecological impact. Unfortunately, the root systems of two trees adjacent to the structure (designated T2 and T3 on -ATRL-SBR-XX-SK-CB-00002) restrict the required new foundations of the footbridge. Even a like-for-like replacement matching the existing footprint would require larger foundations to meet modern design standards. A specialised root survey confirmed that tree roots are too close to the construction area, and the necessary excavation and foundation works will cause too much damage for the trees to be retained. So removal of T2 (Oak) and T3 (Oak) are required under the footbridge replacement scheme. The project team explored multiple design alternatives to avoid tree removal. The proposed scheme represents the most balanced approach. Alternative bridge alignments were considered but ultimately discounted, as they would have resulted in greater ecological disruption, additional land acquisition and negative impact on the canal and surrounding habitat. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision between 11 Dec 2026 and 20 Dec 2026, from recent full applications across the UK.
Site constraints 3
Checked on 18 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Runnymede - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
246 and 248 Woodham Lane Addlestone Surrey KT15 3NS
Construction of a pair of single storey rear extensions.
Pinewoods 74 Dartnell Avenue West Byfleet Surrey KT14 6PJ
Erection of a two storey front, side and rear extension and a single storey fron...
18 Kingston Rise New Haw Surrey KT15 3EY
Conversion of garage to habitable accommodation and first floor extension over, ...
55 Holly Avenue New Haw Surrey KT15 3UD
Prior Approval for a single storey rear extension with a depth of 4 metres beyon...
17 Queen Marys Drive Addlestone Surrey KT15 3TS
Erection of a single storey rear extension following the demolition of the exist...
1 Eden Close New Haw Surrey KT15 3BZ
Two storey side extension, following demolition of garage. New roof at ground fl...
Decision outlook
Day 12 of the 56-day target. Councils usually decide full applications by day 56.
Plota live figures for full applications decided across the UK in the last twelve months, from validation; too few recent full applications in Runnymede to go on. Runnymede decision record →
Consultation & key dates
- Comments by
- 13 Nov 2026
Runnymede ranks #108 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).
Track this application
Scotland Bridge Road Footbridge
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application

Comments are open until 13 Nov 2026