Scotland Bridge Road Footbridge Data via plota.co.uk

Proposal

The existing 1.7-metre-wide Scotland Bridge Road Footbridge has reached the end of its maintainable life, and routine maintenance is no longer a viable long-term option to ensure public safety. Replacement is urgently required to prevent closure of this vital pedestrian link, which is heavily relied upon by local schools, residents, and businesses. As part of this project, we will be replacing the current 1.7m wide path with a 3 wide footbridge. To meet Surreys commitment for accessibility and active travel, on all projects, we must consider how we can improve routes for community links. The current 1.7m wide path is too narrow for shared use which means disabled access, cyclist and prams are frequently required to stop or give way. Widening the footbridge to a 3m will greatly improve this situation and provide a safer environment for all users. There are five oak trees located near the existing structure. The project team has carefully evaluated these trees to minimise ecological impact. Unfortunately, the root systems of two trees adjacent to the structure (designated T2 and T3 on -ATRL-SBR-XX-SK-CB-00002) restrict the required new foundations of the footbridge. Even a like-for-like replacement matching the existing footprint would require larger foundations to meet modern design standards. A specialised root survey confirmed that tree roots are too close to the construction area, and the necessary excavation and foundation works will cause too much damage for the trees to be retained. So removal of T2 (Oak) and T3 (Oak) are required under the footbridge replacement scheme. The project team explored multiple design alternatives to avoid tree removal. The proposed scheme represents the most balanced approach. Alternative bridge alignments were considered but ultimately discounted, as they would have resulted in greater ecological disruption, additional land acquisition and negative impact on the canal and surrounding habitat. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 16 Oct 2026
Decision
Expected by 11 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 11 Dec 2026 and 20 Dec 2026, from recent full applications across the UK.

Comments are open until 13 Nov 2026

Comment on this application ↗

Site constraints 3

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 163 m away: Odiham Common with Bagwell Green and Shaw SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Inside the West Byfleet, Sheerwater and New Haw built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 18 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Runnymede - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Runnymede
Received
around 16 Oct 2026
Validated
16 Oct 2026
Case officer
Show

Decision outlook

Day 12 of the 56-day target. Councils usually decide full applications by day 56.

Day 1244 days to the 56-day target
51%decided within 8 weeks
87%approved
143,608decided in the last year

Plota live figures for full applications decided across the UK in the last twelve months, from validation; too few recent full applications in Runnymede to go on. Runnymede decision record →

Consultation & key dates

Comments by
13 Nov 2026
Runnymede
Planning Authority Score
5.2/10
Average
#140 of 296 councils
Relevant to this application:
Householder decisions

Runnymede ranks #108 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Runnymede decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #242 of 296
89%
Householder approved
Below avg (90%) #208 of 296
72%
Decided in 8 weeks
Above avg (63%) #108 of 296
36%
Extended time limit
Below avg (41%) #113 of 296
66%
Minor dwellings approved
74 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
55%
Change of use approved
11 decided
661
Total decisions
110 refused in the year to March 2026