Nationwide 9 High Street Princes Risborough Buckinghamshire HP27 0AE Data via plota.co.uk

PL/26/05588/FA - Full Application Registered

Proposal

Installation of combined defibrillator and bleed kit cabinet to external wall Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
24 Jul 2026
Consultation
29 Jul 2026
Decision
Expected by 18 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 18 Sept 2026, from Buckinghamshire's recent utility and infrastructure works. The consultation period closed on 8 Sept 2026.

Site constraints 7

Grade II listed: 1, 3 and 4, Queens Square
List entry 1332054 · 13 m from the pin · 20 more listed buildings within 150 m (20 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 20 with distances
Historic England ↗
Princes Risborough conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Former Wycombe Rural District - Poultry Production. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National landscape 426 m away: Chilterns; Inside the Princes Risborough built-up area; Tree preservation order 30 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Buckinghamshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
HP27 0AE
Received
24 Jul 2026
Validated
24 Jul 2026
Ward
Princes Risborough
Parish
Princes Risborough
Case officer
Show
Target decision
18 Sept 2026
Decision level
Delegated Decision
Agent
A&Q Partnership (London) Ltd

Decision outlook

Day 52 of the 56-day target. Buckinghamshire usually decides utility and infrastructure works by day 56.

Day 524 days to the 56-day target
55%decided within 8 weeks
88%approved
101decided in the last year

Plota live figures for utility and infrastructure works decided by Buckinghamshire in the last twelve months, from validation. Buckinghamshire decision record →

Public comments

No public comments yet.

14 neighbours consulted · Last counted 12 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
29 Jul 2026
Consultation
29 Jul 2026
Comments by
8 Sept 2026
Site or press notice
18 Aug 2026
Statutory expiry
18 Sept 2026
Env. assessment
No
Buckinghamshire
Planning Authority Score
1.3/10
Poor
#284 of 296 councils
Relevant to this application:
Householder decisions

Buckinghamshire is one of the slowest councils in England for householder decisions, ranking #280 out of 296. 55% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Buckinghamshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #217 of 296
86%
Householder approved
Below avg (90%) #241 of 296
34%
Decided in 8 weeks
Below avg (63%) #280 of 296
55%
Extended time limit
Above avg (41%) #248 of 296
76%
Minor dwellings approved
491 decided (1-9 homes)
82%
Major dwellings approved
71 decided (10+ homes)
82%
Change of use approved
131 decided
4,446
Total decisions
690 refused in the year to March 2026