Plot 6 Link Park Heathrow Thorney Mill Road West Drayton Data via plota.co.uk

Proposal

(Cross Borough Boundary Application) Waste management facility, including a part change of use from open storage, for the storage, treatment and recycling of metals, including End-of-Life Vehicles, with associated new surfacing and drainage infrastructure, de-pollution building, site office, welfare facilities, car parking, boundary wall, retained fencing and weighbridge Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2026
Decision
Expected by 30 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 83.

The consultation period closed on 2 Oct 2026.

Site constraints 5

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Air quality management area: South Bucks District Council AQMA No 2
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 674 m away: M4 Junctions 3 to 12 Smart Motorway
The site is 674 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Expansion of Heathrow Airport (Third Runway) (at pre-application, 34 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hillingdon built-up area; Flood defence 43 m away (natural high ground, designed for a 1 in 80 year flood).
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hillingdon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hillingdon
Received
6 Aug 2026
Validated
6 Aug 2026
Ward
WEST DRAYTON 2022
Case officer
Show
Target decision
30 Dec 2026
Agent
- Heffernan Ground Floor Left Nesfield House Broughton Hall Business Park Skipton BD23 3AE

Decision outlook

Day 83, past the statutory target. 79% of changes of use in Hillingdon are decided within thirteen weeks, which runs to 5 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 8327 days past the 56-day target
50%decided within 8 weeks
55%approved
115decided in the last year

Plota live figures for changes of use decided by Hillingdon in the last twelve months, from validation. Hillingdon decision record →

Consultation & key dates

Consultation
11 Sept 2026
Comments by
2 Oct 2026
Hillingdon
Planning Authority Score
3.5/10
Below average
#219 of 296 councils
Relevant to this application:
Change of use

Hillingdon ranks #194 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hillingdon decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #208 of 296
90%
Householder approved
Above avg (90%) #191 of 296
58%
Decided in 8 weeks
Below avg (63%) #194 of 296
45%
Extended time limit
Above avg (41%) #190 of 296
61%
Minor dwellings approved
67 decided (1-9 homes)
65%
Change of use approved
17 decided
1,680
Total decisions
255 refused in the year to March 2026