Community Diagnostics Centre Land At Lincoln Science And Innovation Park Beevor Street Lincoln Lincolnshire Data via plota.co.uk

2025/0407/FUL - Full Application Approved

Proposal

Extension to the Community Diagnostics Centre (Use Class E( e)), for an outpatient clinic extension, with access, car parking, landscaping and associated infrastructure. (Amended description) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Jul 2025
✓
Approved
6 Oct 2025

Approved on 6 Oct 2025 · Planning Team Leader · Last checked 15 Oct 2026

Documents 47

Statements & assessments 22

PDF FLOOD RISK EVACUATION PLAN Correspondence · 12 Aug 2025 View ↗ PDF (REVISED) DESIGN AND ACCESS STATEMENT V.02 Supporting Document · 4 Aug 2025 View ↗ PDF REV P03 (REVISED) DRAINAGE STRATEGY REPORT Supporting Document · 4 Aug 2025 View ↗ PDF P02 (REVISED) FLOOD RISK ASSESSMENT 27.07.25 Supporting Document · 4 Aug 2025 View ↗ PDF REV 05 (REVISED) 25023-MDA DRAINAGE LAYOUT Supporting Document · 4 Aug 2025 View ↗ PDF P02 (REVISED) ENERGY STATEMENT P02 Supporting Document · 4 Aug 2025 View ↗ PDF (REVISED) BNG STATEMENT OF EXEMPTION, JULY 2025 Supporting Document · 4 Aug 2025 View ↗ PDF FLOOD RISK ASSESSMENT Supporting Document · 17 Jul 2025 View ↗ PDF G001 DRAINAGE STRATEDY REPORT Supporting Document · 17 Jul 2025 View ↗ PDF REVISED DRAINAGE STRATEGY Supporting Document · 10 Jul 2025 View ↗ PDF (SUPERSEDED) BNG EXEMPTION STATEMENT Supporting Document · 7 Jul 2025 View ↗ PDF (SUPERSEDED) DESIGN AND ACCESS STATEMENT Supporting Document · 7 Jul 2025 View ↗ PDF (SUPERSEDED) DRAINAGE STRATEGY REPORT Supporting Document · 7 Jul 2025 View ↗ PDF DRAINAGE DOCUMENTATION Other · 7 Jul 2025 View ↗ PDF (SUPERSEDED) ENERGY STATEMENT Supporting Document · 7 Jul 2025 View ↗ PDF (SUPERSEDED) FLOOD RISK ASSESSMENT Supporting Document · 7 Jul 2025 View ↗ PDF FLOOD WARNING & EVACUATION PLAN Supporting Document · 7 Jul 2025 View ↗ PDF NOISE LEVELS INFORMATION Supporting Document · 7 Jul 2025 View ↗ PDF GEO-ENVIRONMENTAL ASSESSMENT Supporting Document · 7 Jul 2025 View ↗ PDF BOREHOLE LOCATION - CONTAMINATION ASSESSMENT Supporting Document · 7 Jul 2025 View ↗ PDF DYNAMIC SAMPLER LOG - CONTAMINATION ASSESSMENT Supporting Document · 7 Jul 2025 View ↗ PDF ANALYTICAL REPORT - CONTAMINATION Supporting Document · 7 Jul 2025 View ↗

All documents on the council site ↗

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 15 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lincoln - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Lincoln
Application type
Full Application
Received
7 Jul 2025
Validated
7 Jul 2025
Ward
Boultham
Case officer
Show
Target decision
7 Oct 2025
Decision
Granted Conditionally
Decision date
6 Oct 2025
Decision level
Planning Team Leader
Applicant
Show
Agent
Bramhall Town Planning Limited

How this decision compares

Decided in 91 days from validation, 37 days slower than Lincoln's median of 54 for full applications. Approved, as 87% of full applications here are.

59%decided within 8 weeks
87%approved
100%go to committee

Plota live figures for full applications decided by Lincoln in the last twelve months, from validation. Lincoln decision record →

Public comments

No public comments yet.

37 neighbours consulted · Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14047891
Planning Portal ref
PP-14047891
Statutory expiry
2 Sept 2025
Env. assessment
No
Lincoln
Planning Authority Score
9.2/10
Excellent
#2 of 296 councils
Relevant to this application:
Householder decisions

Lincoln is faster than most councils at deciding householder applications, ranking #44 out of 296. Only 24% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

More permissive than most councils
99% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Lincoln decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #59 of 296
99%
Householder approved
Above avg (90%) #5 of 296
79%
Decided in 8 weeks
Above avg (63%) #44 of 296
24%
Extended time limit
Below avg (41%) #26 of 296
82%
Minor dwellings approved
22 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
97%
Change of use approved
34 decided
336
Total decisions
23 refused in the year to March 2026