Footbridge Frimley Business Park Frimley Camberley Hampshire Data via plota.co.uk

26/00523/DEMOPP - Demolition via PP Approved

Proposal

Prior Approval Application : demolition of disused pedestrian footbridge over the River Blackwater Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2026
✓
Consultation
20 Oct 2026
✓
Approved
26 Oct 2026

Approved on 26 Oct 2026 · Delegated to Service Manager · Last checked 27 Oct 2026

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 1005 m away: Southampton to London Pipeline Project
The site is 1005 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Flood defence 29 m away (natural high ground, designed for a 1 in 100 year flood); Inside the Farnborough built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 21 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rushmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rushmoor
Application type
Demolition via PP
Received
29 Sept 2026
Validated
29 Sept 2026
Ward
Cherrywood
Case officer
Show
Target decision
26 Oct 2026
Decision
Prior Approval Required and Granted
Decision date
26 Oct 2026
Decision level
Delegated to Service Manager
Applicant
Show
Agent
Pegasus Group

How this decision compares

Decided in 27 days from validation, 15 days faster than Rushmoor's median of 42 for demolitions. Approved, as 87% of demolitions here are.

85%decided within 8 weeks
87%approved
40decided in the last year

Plota live figures for demolitions decided by Rushmoor in the last twelve months, from validation. Rushmoor decision record →

Public comments

No public comments yet.

Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15243700
Planning Portal ref
PP-15243700
Consultation
20 Oct 2026
Comments by
10 Nov 2026
Statutory expiry
26 Oct 2026
Env. assessment
No
Rushmoor
Planning Authority Score
8.9/10
Excellent
#9 of 296 councils
Relevant to this application:
Householder decisions

Rushmoor is one of the fastest councils in England for householder decisions, ranking #22 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rushmoor decision statistics
Based on MHCLG data, the nine months to December 2025
95%
Overall approval rate
Above avg (87%) #26 of 296
97%
Householder approved
Above avg (90%) #41 of 296
86%
Decided in 8 weeks
Above avg (63%) #22 of 296
26%
Extended time limit
Below avg (41%) #36 of 296
71%
Minor dwellings approved
14 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
100%
Change of use approved
7 decided
257
Total decisions
13 refused in the nine months to December 2025