67A Saltmarsh Drive Bristol BS11 0NL Data via plota.co.uk

26/13620/CP - Certificate of Lawfulness - proposed Pending decision

Proposal

Application for a Lawful Development Certificate for a Proposed installation of two air source heat pumps under Part 12 Class A of the GPDO, and proposed installation of a roof mounted PV Array under Part 14 Class A of the GPDO. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Aug 2026
✓
Validated
8 Sept 2026
Decision
Expected by 3 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 50.

Site constraints 3

National infrastructure project about 542 m away: Hinkley Point C Connection
The site is about 542 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 533 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 3; Inside the Bristol built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bristol
Application type
Certificate of Lawfulness - proposed
Postcode
BS11 0NL
Received
26 Aug 2026
Validated
8 Sept 2026
Ward
Avonmouth & Lawrence Weston
Parish
Avonmouth And Lawrence Weston
Target decision
3 Nov 2026
Applicant
Show
Agent
Savills

Decision outlook

Day 50, past Bristol's usual 28 days for lawful development certificates. 99% are decided within thirteen weeks, so most likely by 8 Dec 2026.

Day 506 days to the 56-day target
96%decided within 8 weeks
85%approved
422decided in the last year

Plota live figures for lawful development certificates decided by Bristol in the last twelve months, from validation. Bristol decision record →

Public comments

No public comments yet.

Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14948457
Planning Portal ref
PP-14948457
Statutory expiry
3 Nov 2026
Bristol
Planning Authority Score
5.8/10
Average
#109 of 296 councils
Relevant to this application:
Householder decisions

Bristol ranks #112 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Bristol decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #190 of 296
92%
Householder approved
Above avg (90%) #149 of 296
71%
Decided in 8 weeks
Above avg (63%) #112 of 296
37%
Extended time limit
Below avg (41%) #118 of 296
74%
Minor dwellings approved
374 decided (1-9 homes)
93%
Major dwellings approved
30 decided (10+ homes)
82%
Change of use approved
150 decided
2,098
Total decisions
293 refused in the year to March 2026