2026/1263 Pending

Proposal

Technical Details for 2 x 2 bed detached bungalows with ancillary details (pursuant to permission in principle ). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Oct 2026
Decision
Expected by 10 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 19 Dec 2026 and 27 Jan 2027, from Tandridge's recent new homes.

Comments are open until 13 Nov 2026

Comment on this application ↗

Site constraints 6

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Article 4 direction
Land East Of A22 And South Of / Redhill Tonbridge Railway.. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 984 m away: Gatwick Airport Northern Runway
The site is about 984 m from the project boundary. Airport, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Shipley Bridge built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 20 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £458,000 in July 2013. Semi-detached house, freehold.

4 July 2013£458,000
11 January 2006£295,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area170 m² (1,830 sq ft)
Energy ratingD (67 out of 100), could reach C
PropertyDetached house, 8 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in September 2012, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Tandridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Tandridge
Postcode
RH6 9TE
Received
19 Oct 2026
Validated
19 Oct 2026
Parish
Burstow
Target decision
10 Dec 2026

Decision outlook

Day 9 of the 56-day target. Tandridge usually decides new homes by day 80.

Day 971 days to the predicted decision (day 80)
37%decided within 8 weeks
42%approved
60decided in the last year

Plota live figures for new homes decided by Tandridge in the last twelve months, from validation. Tandridge decision record →

Consultation & key dates

Comments by
13 Nov 2026
Tandridge
Planning Authority Score
2.3/10
Poor
#264 of 296 councils
Relevant to this application:
Householder decisions

Tandridge is slower than most councils at deciding householder applications, ranking #234 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Tandridge decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #228 of 296
90%
Householder approved
Above avg (90%) #196 of 296
51%
Decided in 8 weeks
Below avg (63%) #234 of 296
56%
Extended time limit
Above avg (41%) #255 of 296
68%
Minor dwellings approved
122 decided (1-9 homes)
47%
Major dwellings approved
17 decided (10+ homes)
75%
Change of use approved
8 decided
701
Total decisions
113 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.