Land between the M1 and the A507, Ridgmont Bypass, Husborne Crawley Data via plota.co.uk

CB/26/00630/FULL - Full Application Approved

Proposal

Installation of a pumping station, a DNO kiosk, access, fencing and landscaping Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Feb 2026
✓
Validated
6 Mar 2026
✓
Approved
22 Jul 2026

Approved on 22 Jul 2026 · Last checked 13 Oct 2026

Associated applications 3

Site constraints 5

Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project: East West Rail - Bedford to Cambridge and Western improvements, at pre-application; 1 listed building within 150 m of the postcode pin; Inside the Brogborough built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
25 Feb 2026
Validated
6 Mar 2026
Parish
Husborne Crawley
Case officer
Show
Target decision
1 May 2026
Decision
Full Application - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). 2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. 3 )The applicants attention is drawn to their responsibility under The Equality Act 2010 and with particular regard to access arrangements for the disabled. The Equality Act 2010 requires that service providers must think ahead and make reasonable adjustments to address barriers that impede disabled people. These requirements are as follows: Where a provision, criterion or practice puts disabled people at a substantial disadvantage to take reasonable steps to avoid that disadvantage; Where a physical feature puts disabled people at a substantial disadvantage to avoid that disadvantage or adopt a reasonable alternative method of providing the service or exercising the function; Where not providing an auxiliary aid puts disabled people at a substantial disadvantage to provide that auxiliary aid. In doing this, it is a good idea to consider the range of disabilities that your actual or potential service users might have. You should not wait until a disabled person experiences difficulties using a service, as this may make it too late to make the necessary adjustment. For further information on disability access contact: The Centre for Accessible Environments (www.cae.org.uk) Central Bedfordshire Access Group (www.centralbedsaccessgroup.co.uk)The applicants attention is drawn to their responsibility under The Equality Act 2010 and with particular regard to access arrangements for the disabled. The Equality Act 2010 requires that service providers must think ahead and make reasonable adjustments to address barriers that impede disabled people. These requirements are as follows: Where a provision, criterion or practice puts disabled people at a substantial disadvantage to take reasonable steps to avoid that disadvantage; Where a physical feature puts disabled people at a substantial disadvantage to avoid that disadvantage or adopt a reasonable alternative method of providing the service or exercising the function; Where not providing an auxiliary aid puts disabled people at a substantial disadvantage to provide that auxiliary aid. In doing this, it is a good idea to consider the range of disabilities that your actual or potential service users might have. You should not wait until a disabled person experiences difficulties using a service, as this may make it too late to make the necessary adjustment. For further information on disability access contact: The Centre for Accessible Environments (www.cae.org.uk) Central Bedfordshire Access Group (www.centralbedsaccessgroup.co.uk) 4 )Highways Notes Unless the applicant has gained a permit/license from the Councils Street Works team, the applicant is advised that, under the provisions of the Highways Act 1980, no part of any structure, including foundations and surface water hardware shall be erected or installed within the public highway. The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highwayHighways Notes Unless the applicant has gained a permit/license from the Councils Street Works team, the applicant is advised that, under the provisions of the Highways Act 1980, no part of any structure, including foundations and surface water hardware shall be erected or installed within the public highway. The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highway 5 )The applicant is advised that the site lies within the Internal Drainage Board district and that separate consent may be required under the Land Drainage Act 1991 and the Board's Byelaws for any works affecting the Board's watercourse. The granting of planning permission does not remove the requirement to obtain any necessary consents from the Internal Drainage Board.The applicant is advised that the site lies within the Internal Drainage Board district and that separate consent may be required under the Land Drainage Act 1991 and the Board's Byelaws for any works affecting the Board's watercourse. The granting of planning permission does not remove the requirement to obtain any necessary consents from the Internal Drainage Board. 6 )Nature Space Informatives: It is recommended that the NatureSpace Best Practice Principles are taken into account and implemented where possible and appropriate. It is essential to note that any works or activities whatsoever undertaken on site (including ground investigations, site preparatory works or ground clearance) prior to receipt of the written authorisation from the planning authority which permits the development to proceed under the District Licence (WML-OR152, or a 'Further Licence') are not licensed under the great crested newt District Licence. Any such works or activities have no legal protection under the great crested newt District Licence and if offences against great crested newt are thereby committed then criminal investigation and prosecution by the police may follow.Nature Space Informatives: It is recommended that the NatureSpace Best Practice Principles are taken into account and implemented where possible and appropriate. It is essential to note that any works or activities whatsoever undertaken on site (including ground investigations, site preparatory works or ground clearance) prior to receipt of the written authorisation from the planning authority which permits the development to proceed under the District Licence (WML-OR152, or a 'Further Licence') are not licensed under the great crested newt District Licence. Any such works or activities have no legal protection under the great crested newt District Licence and if offences against great crested newt are thereby committed then criminal investigation and prosecution by the police may follow. 7 )The applicant is advised that the site contains and adjoins a watercourse under the control of the Internal Drainage Board. Any works within 9 metres of the top of the bank, including temporary works, fencing, planting or landscaping, may require the Board's prior consent under the Land Drainage Act 1991 and the Board's Byelaws. Planning permission does not remove the need to obtain any separate consent from the Internal Drainage Board.The applicant is advised that the site contains and adjoins a watercourse under the control of the Internal Drainage Board. Any works within 9 metres of the top of the bank, including temporary works, fencing, planting or landscaping, may require the Board's prior consent under the Land Drainage Act 1991 and the Board's Byelaws. Planning permission does not remove the need to obtain any separate consent from the Internal Drainage Board.
Decision date
22 Jul 2026

How this decision compares

Decided in 138 days from validation, 79 days slower than Central Bedfordshire's median of 59 for utility and infrastructure works. Approved, as 88% of utility and infrastructure works here are.

48%decided within 8 weeks
88%approved
27decided in the last year

Plota live figures for utility and infrastructure works decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →

Public comments

No public comments yet.

Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
6 Mar 2026
Comments by
13 Jul 2026
Site or press notice
26 Mar 2026
Central Bedfordshire
Planning Authority Score
6.3/10
Average
#88 of 296 councils
Relevant to this application:
Householder decisions

Central Bedfordshire is faster than most councils at deciding householder applications, ranking #62 out of 296. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Central Bedfordshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #218 of 296
91%
Householder approved
Above avg (90%) #169 of 296
76%
Decided in 8 weeks
Above avg (63%) #62 of 296
35%
Extended time limit
Below avg (41%) #99 of 296
61%
Minor dwellings approved
153 decided (1-9 homes)
86%
Major dwellings approved
29 decided (10+ homes)
73%
Change of use approved
45 decided
1,444
Total decisions
226 refused in the year to March 2026