Land Rear Of Marlow Crescent Chillaton Data via plota.co.uk

2254/26/PIP - Permission In Principle Within Consultation Period

Proposal

Application for permission in principle for development of the site for up to 9 dwellings Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
25 Aug 2026
Decision
Expected by 20 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 19 Oct 2026 and 28 Oct 2026, from West Devon's recent new homes.

Site constraints 2

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
West Devon
Application type
Permission In Principle
Received
25 Aug 2026
Validated
25 Aug 2026
Ward
Milton Ford
Parish
Milton Abbot
Case officer
Show
Applicant
Show
Agent
EJFP Planning Ltd

Decision outlook

Day 20 of the 56-day target. West Devon usually decides new homes by day 56.

Day 2036 days to the 56-day target
57%decided within 8 weeks
60%approved
38decided in the last year

Plota live figures for new homes decided by West Devon in the last twelve months, from validation. West Devon decision record →

Consultation & key dates

Consultation
26 Aug 2026