40 Silver Walk, Nuneaton, Warwickshire, CV10 7LY Data via plota.co.uk

26/0128/FUL - Full Planning Permission Pending Decision

Proposal

Change of Use Single Dwelling(C3) to Children Home(C2) For up to 3 Children Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Validated
8 Sept 2026
✓
Received
10 Sept 2026
Decision
Expected by 3 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 11 Nov 2026 and 13 Dec 2026, from Nuneaton's recent changes of use.

Site constraints 4

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Also on the record
Radon affected area, class 4; National infrastructure project 264 m away: The Grand Union Canal Transfer, at pre-application; Inside the Nuneaton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £119,845 in June 2005. Semi-detached house, leasehold.

17 June 2005£119,845
17 April 1998£61,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area114 m² (1,227 sq ft)
Energy ratingC (73 out of 100), could reach B
PropertySemi-detached house, 7 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsTimber frame, as built, partial insulation (assumed)

From the energy performance certificate lodged in December 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Nuneaton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Nuneaton
Application type
Full Planning Permission
Postcode
CV10 7LY
Received
10 Sept 2026
Validated
8 Sept 2026
Ward
Stockingford East
Case officer
Show
Target decision
3 Nov 2026
Decision level
Under Consideration
Applicant
Show
Agent
Rhemua Design

Decision outlook

Day 51 of the 56-day target. Nuneaton usually decides changes of use by day 75.

Day 5124 days to the predicted decision (day 75)
33%decided within 8 weeks
93%approved
5%go to committee

Plota live figures for changes of use decided by Nuneaton in the last twelve months, from validation. Nuneaton decision record →

Consultation & key dates

Statutory expiry
3 Nov 2026
Nuneaton
Planning Authority Score
5.2/10
Average
#138 of 296 councils
Relevant to this application:
Change of use

Nuneaton ranks #168 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Nuneaton decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #24 of 296
97%
Householder approved
Above avg (90%) #40 of 296
62%
Decided in 8 weeks
Below avg (63%) #168 of 296
48%
Extended time limit
Above avg (41%) #216 of 296
80%
Minor dwellings approved
15 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
25 decided
306
Total decisions
16 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.