Land At E.G.G. Precision Engineering Wingate Road Gosport PO12 4DU Data via plota.co.uk

26/00254/GDO - GDO Part 24 Registered

Proposal

Replacement of 3no. Antennas, installation of 1no. Dish and internal upgrades within the existing cabinet Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
19 Aug 2026
Consultation
26 Aug 2026
Decision
Expected by 13 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from Gosport's recent full applications. Comments are open until 16 Sept 2026.

Comment on this application ↗

Site constraints 3

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Scheduled monument 117 m away: Fort Brockhurst
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Inside the Gosport built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gosport - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gosport
Application type
GDO Part 24
Postcode
PO12 4DU
Received
19 Aug 2026
Validated
19 Aug 2026
Ward
Elson
Case officer
Show
Target decision
13 Oct 2026
Applicant
Show
Agent
Beacon Comms

Decision outlook

Day 26 of the 56-day target. Gosport usually decides full applications by day 51.

Day 2630 days to the 56-day target
85%decided within 8 weeks
95%approved
96decided in the last year

Plota live figures for full applications decided by Gosport in the last twelve months, from validation. Gosport decision record →

Public comments

No public comments yet.

9 neighbours consulted · Last counted 8 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15166681
Neighbours
26 Aug 2026
Consultation
26 Aug 2026
Comments by
16 Sept 2026
Statutory expiry
13 Oct 2026
Env. assessment
No
Gosport
Planning Authority Score
8.3/10
Excellent
#19 of 296 councils
Relevant to this application:
Householder decisions

Gosport is faster than most councils at deciding householder applications, ranking #66 out of 296. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Gosport decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #38 of 296
97%
Householder approved
Above avg (90%) #32 of 296
76%
Decided in 8 weeks
Above avg (63%) #66 of 296
30%
Extended time limit
Below avg (41%) #54 of 296
67%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
85%
Change of use approved
13 decided
226
Total decisions
13 refused in the year to March 2026