29 The Avenue Ickenham Data via plota.co.uk

996/APP/2025/2116 Approved

Proposal

Erection of new dwellinghouse including landscaping, bin storage and parking, following the demolition of existing dwellinghouse. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2025
✓
Approved
19 Dec 2025

Approved on 19 Dec 2025 · Last checked 14 Oct 2026

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Ickenham Village conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Article 4 direction
Residential extensions. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Hillingdon AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Hillingdon built-up area; Public transport access: PTAL 1a (very poor), TfL 2023, for the 100 m square; Green belt about 24 m away: London; Priority habitat about 22 m away: Deciduous woodland.
Not affected
No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hillingdon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hillingdon
Received
6 Aug 2025
Validated
6 Aug 2025
Ward
ICK/HAM & S HF/D 22
Case officer
Show
Target decision
23 Dec 2025
Decision
Approval
Decision date
19 Dec 2025

How this decision compares

Decided in 135 days from validation, 72 days slower than Hillingdon's median of 63 for full applications. Approved, as 88% of full applications here are.

37%decided within 8 weeks
88%approved
1,425decided in the last year

Plota live figures for full applications decided by Hillingdon in the last twelve months, from validation. Hillingdon decision record →

Consultation & key dates

Consultation
20 Aug 2025
Comments by
11 Sept 2025
Hillingdon
Planning Authority Score
3.5/10
Below average
#219 of 296 councils
Relevant to this application:
Householder decisions

Hillingdon ranks #194 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hillingdon decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #208 of 296
90%
Householder approved
Above avg (90%) #191 of 296
58%
Decided in 8 weeks
Below avg (63%) #194 of 296
45%
Extended time limit
Above avg (41%) #190 of 296
61%
Minor dwellings approved
67 decided (1-9 homes)
65%
Change of use approved
17 decided
1,680
Total decisions
255 refused in the year to March 2026