Pont Ithel Bridge , Pontithel, Brecon, LD3 0SA Data via plota.co.uk

P/26/0462/LBC - LBC Approved

Proposal

Repair works to bridge to include rebuild of a section of loss on upstream pier at foundation level Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Jun 2026
✓
Approved
1 Oct 2026

Approved on 1 Oct 2026 · Delegated Decision · Last checked 1 Oct 2026

Site constraints 7

5 listed buildings within 150 m of the postcode pin
Nearest: 5 Pontithel Cottages, Grade II, about 1 m from the postcode pin · 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: River Wye
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation about 74 m away: River Wye / Afon Gwy (Wales)
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI about 74 m away: Afon Llynfi
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 3.
Not affected
No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
LBC
Postcode
LD3 0SA
Received
15 Jun 2026
Validated
15 Jun 2026
Ward
Bronllys
Parish
Bronllys
Case officer
Show
Target decision
10 Aug 2026
Decision
Approve
Decision date
1 Oct 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 108 days from validation, 33 days slower than Powys's median of 75 for commercial and major works. Approved, as 88% of commercial and major works here are.

45%decided within 8 weeks
88%approved
42decided in the last year

Plota live figures for commercial and major works decided by Powys in the last twelve months, from validation. Powys decision record →

Public comments

3comments received
3 neutral

Last counted 1 Oct 2026

Read the comments on the council site ↗