125 High Street Cottenham Cambridgeshire CB24 8SD Data via plota.co.uk

26/03123/FUL - Full Application Awaiting decision

Proposal

Demolition of existing storage units and the construction of 2 No. self/custom build dwellings including the installation of solar panels on the South West facing roof slope and an air source heat pump for each dwelling on land to the rear of 125-127 High Street. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
Consultation
4 Sept 2026
Decision
Target date was 12 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 72.

Site constraints 5

Cottenham conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
8 listed buildings within 150 m
Nearest: Pond Farmhouse, Grade II, 28 m away · 8 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 8 with distances
Historic England ↗
Also on the record
Scheduled monument 233 m away: Cottenham moated site; Inside the Cottenham built-up area; Priority habitat 27 m away: No main habitat but additional habitats present.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Cambridgeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
CB24 8SD
Received
17 Aug 2026
Validated
17 Aug 2026
Ward
Cottenham
Parish
Cottenham CP
Case officer
Show
Target decision
12 Oct 2026
Applicant
Show
Agent
plan it architecture + design

Decision outlook

Day 72, past the statutory target. 90% of demolitions in South Cambridgeshire are decided within thirteen weeks, which runs to 16 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 7216 days past the 56-day target
74%decided within 8 weeks
96%approved
143decided in the last year

Plota live figures for demolitions decided by South Cambridgeshire in the last twelve months, from validation. South Cambridgeshire decision record →

Public comments

2comments received
1 objecting1 neutral

16 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
4 Sept 2026
Statutory expiry
12 Oct 2026
Env. assessment
No
South Cambridgeshire
Planning Authority Score
8.1/10
Excellent
#25 of 296 councils
Relevant to this application:
Householder decisions

South Cambridgeshire is one of the fastest councils in England for householder decisions, ranking #24 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
South Cambridgeshire decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #45 of 296
95%
Householder approved
Above avg (90%) #91 of 296
84%
Decided in 8 weeks
Above avg (63%) #24 of 296
31%
Extended time limit
Below avg (41%) #60 of 296
86%
Minor dwellings approved
215 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
79%
Change of use approved
38 decided
1,509
Total decisions
96 refused in the year to March 2026