CB/25/02759/FULL - Full Application Approved

Proposal

Demolition of the existing building and erection of a new building within a flexible range of uses (Classes E(g)(iii) Light Industrial, B2 General Industrial and / or B8 Storage and Distribution) with ancillary offices, together with all other associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Aug 2025
✓
Validated
4 Nov 2025
✓
Approved
25 Aug 2026

Approved on 25 Aug 2026 · Last checked 18 Oct 2026

Associated applications 3

Site constraints 2

National infrastructure project about 667 m away: Woodside Link Houghton Regis Bedfordshire
The site is about 667 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Luton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 7 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
LU5 4TT
Received
29 Aug 2025
Validated
4 Nov 2025
Parish
Dunstable
Case officer
Show
Target decision
3 Feb 2026
Decision
Full Application - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). 2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. 3 )Highways Informative The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301. The applicant is advised that the storage of materials associated with the construction of this development should take place within the site and not extend into or within the public highway without authorisation from the highway authority. If necessary, the applicant should contact the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301 The applicant is advised that in order to comply with the conditions related to highways and access works related to this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uk The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.Highways Informative The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301. The applicant is advised that the storage of materials associated with the construction of this development should take place within the site and not extend into or within the public highway without authorisation from the highway authority. If necessary, the applicant should contact the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301 The applicant is advised that in order to comply with the conditions related to highways and access works related to this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail highwaysagreements@centralbedfordshire.gov.uk The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. 4 )Drainage Informative 1.Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK 2. We would expect some SuDS features/diversity enhancement in all phases. 3. We will require a full set of calculations for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. 4. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. 5. We will require BRE365 infiltration test results. 6. There should be a minimum 1m between the base of a soakage unit and the seasonal water table. 7. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 8. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 9. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 10. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).Drainage Informative 1.Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK 2. We would expect some SuDS features/diversity enhancement in all phases. 3. We will require a full set of calculations for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. 4. We will require full drainage drawings showing all connections, control features, storage, inverts etc. and how it communicates with the development wide scheme. 5. We will require BRE365 infiltration test results. 6. There should be a minimum 1m between the base of a soakage unit and the seasonal water table. 7. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 8. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 9. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 10. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 5 )Anglian Water Informative Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087 Option 2.Anglian Water Informative Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087 Option 2. 6 )Digital Communications Informative Consideration should be given to ensuring that any new premises are connected to an adequate broadband service and therefore engagement with a supplier of the applicants choice is recommended ahead of the buildDigital Communications Informative Consideration should be given to ensuring that any new premises are connected to an adequate broadband service and therefore engagement with a supplier of the applicants choice is recommended ahead of the build
Decision date
25 Aug 2026

How this decision compares

Decided in 294 days from validation, 239 days slower than Central Bedfordshire's median of 55 for full applications. Approved, as 85% of full applications here are.

63%decided within 8 weeks
85%approved
100%go to committee

Plota live figures for full applications decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →

Public comments

No public comments yet.

Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
4 Nov 2025
Comments by
11 Mar 2026
Site or press notice
12 Nov 2025
Central Bedfordshire
Planning Authority Score
6.3/10
Average
#88 of 296 councils
Relevant to this application:
Householder decisions

Central Bedfordshire is faster than most councils at deciding householder applications, ranking #62 out of 296. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Central Bedfordshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #218 of 296
91%
Householder approved
Above avg (90%) #169 of 296
76%
Decided in 8 weeks
Above avg (63%) #62 of 296
35%
Extended time limit
Below avg (41%) #99 of 296
61%
Minor dwellings approved
153 decided (1-9 homes)
86%
Major dwellings approved
29 decided (10+ homes)
73%
Change of use approved
45 decided
1,444
Total decisions
226 refused in the year to March 2026