Unit 1 To 3, Holford Mews, Cruikshank Street, London, WC1X 9HW Data via plota.co.uk
Proposal
Replacement heating system and associated works including installation of plant equipment, enclosures, meter cabinet and louvres. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 60.
Site constraints 24
Show all 10 with distances
- 52 mNumbers 2-17 (Consecutive) and Attached RailingsGrade II
- 91 mNumber 67a, 67-83 (Odd) and Attached RailingsGrade II
- 95 mBevin CourtGrade II*
- 106 m69, Great Percy StreetGrade II
- 113 mNumbers 41a, 41-49 (Odd) and Attached RailingsGrade II
- 118 mClaremont Square ReservoirGrade II
- 133 mNumbers 70-90 (Even) and Attached RailingsGrade II
- 133 mNumbers 66-72 (Even) and Attached Iron RailingsGrade II
- 145 mNumbers 21-39 (Odd) and Attached RailingsGrade II
- 145 mNumbers 18-31 (Consecutive) and Attached RailingsGrade II
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in April 2021, the latest held for this property. The building may have changed since. View the certificate
Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
3 Killick Street, London, N1 9FG
Replacement of the existing external wall insulation and cladding with non-combu...
10 Barnsbury Road, London, N1 0HB
Certificate of Lawfulness (Existing) to confirm the use of the second and third
12 Chadwell Street, London, EC1R 1XD
Demolition of an existing damaged garden wall and the erection of a new garden w
12 Chadwell Street, London, EC1R 1XD
Demolition of an existing damaged garden wall and the erection of a new garden w
43 - 53 Myddelton Square, London, EC1R 1YD
Retrospective application for installation of 1 no. gas riser to the rear elevat
43 - 53 Myddelton Square, London, EC1R 1YD
Retrospective application for installation of 1 no. gas riser to the rear elevat
Important details
Decision outlook
Day 60, past the statutory target. 88% of utility and infrastructure works in Islington are decided within thirteen weeks, which runs to 9 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.
Plota live figures for utility and infrastructure works decided by Islington in the last twelve months, from validation. Islington decision record →
Consultation & key dates
- Alt. reference
- PP-14983194
- Comments by
- 9 Sept 2026
- Site or press notice
- 17 Aug 2026
- Statutory expiry
- 10 Sept 2026
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Islington is slower than most councils at deciding householder applications, ranking #260 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
Unit 1 To 3, Holford Mews, Cruikshank Street, London, WC1X 9HW
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 9 Sept 2026.