229-235 Southwark Bridge Road London Southwark SE1 6NP Data via plota.co.uk

26/AP/2320 - Major application Under consideration/assessment

Proposal

Redevelopment of the site to include demolition of no. 229 and Pocock House, erection of a purpose built student accommodation building (Sui Generis), retention and remodeling of nos. 231 and 233 to provide flexible commercial/community floorspace (Class E / Class F1 / Class F2), with associated public realm, access, car parking, cycle parking, hard and soft landscaping and other ancillary works. For information only: - The proposed PBSA building including additional rooftop plant/enclosure is Maximum 150.655m AOD/147.055m above ground and is 45 storeys. The maximum height of the remodeling of Nos 231 and 233 is 18.745m AOD/15.145m above ground. The development as a whole comprises: - 798 bedrooms: 851 bedspaces - 255 sqm GIA of flexible commercial, learning and non-residential institution floorspace (Class E / F1/F2 use); The application is accompanied by an Environmental Statement (ES) in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended). This can be viewed on Southwark Council's Public Access for Planning Register. Hard copies of the ES are available for inspection at the John Harvard Library, 211 Borough High St, London SE1 1JA (Monday to Friday 9am to 7pm, Saturday 9am-5pm). Hard copies can also be purchased from DP9 Ltd 100 Pall Mall, London, SW1Y 5NQ, telephone: 020 7004 1700 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Aug 2026
✓
Validated
10 Sept 2026
Decision
Expected by 31 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 1 Nov 2026 and 10 Nov 2026, from Southwark's recent changes of use.

Documents 205

Statements & assessments 131

PDF CIRCULAR ECONOMY GLA PLANNING SPEADSHEET Circular Economy Statement · 11 Sept 2026 View ↗ PDF PART 1 OF 9 HERITAGE IMPACT ASSESSMENT - MAY 2026 Heritage statement · 5 Aug 2026 View ↗ PDF PART 1 OF 34 ES VOL 3 APP MAY 2026 CHAPTER 1 INTRODUCTION Environmental statement · 5 Aug 2026 View ↗ PDF PART 10 OF 34 ES VOL 3 APP MAY 2026 CHAPTER 8 AIR QUALITY Environmental statement · 5 Aug 2026 View ↗ PDF PART 2 OF 34 ES VOL 3 APP MAY 2026 2.1 EIA SCOPING REPORT PART 1 OF 2 Environmental statement · 5 Aug 2026 View ↗ PDF PART 3 OF 34 ES VOL 3 APP MAY 2026 2.1 EIA SCOPING REPORT PART 2 OF 2 Environmental statement · 5 Aug 2026 View ↗ PDF PART 17 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 2 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 5 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 10 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 12 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 13 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 14 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 15 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 16 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 1 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 18 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 19 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 20 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 3 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 4 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 6 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 7 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 8 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 9 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 11 OF 20 DESIGN AND ACCESS STATEMENT - JULY 2026 Design and Access statement · 3 Aug 2026 View ↗ PDF PART 1 OF 7 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026 Flood risk assessment · 3 Aug 2026 View ↗ PDF PART 2 OF 7 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026 Flood risk assessment · 3 Aug 2026 View ↗ PDF PART 3 OF 7 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026 Flood risk assessment · 3 Aug 2026 View ↗ PDF PART 4 OF 7 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026 Flood risk assessment · 3 Aug 2026 View ↗ PDF PART 5 OF 7 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026 Flood risk assessment · 3 Aug 2026 View ↗ PDF PART 7 OF 7 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026 Flood risk assessment · 3 Aug 2026 View ↗ PDF PART 6 OF 7 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - JULY 2026 Flood risk assessment · 3 Aug 2026 View ↗ PDF PART 5 OF 5 FINANCIAL VIABILITY ASSESSMENT WITH APPENDICES Viability report · 3 Aug 2026 View ↗ PDF PART 1 OF 5 FINANCIAL VIABILITY ASSESSMENT WITH APPENDICES Viability report · 3 Aug 2026 View ↗ PDF PART 2 OF 5 FINANCIAL VIABILITY ASSESSMENT WITH APPENDICES Viability report · 3 Aug 2026 View ↗ PDF PART 3 OF 5 FINANCIAL VIABILITY ASSESSMENT WITH APPENDICES Viability report · 3 Aug 2026 View ↗ PDF PART 4 OF 5 FINANCIAL VIABILITY ASSESSMENT WITH APPENDICES Viability report · 3 Aug 2026 View ↗ PDF PART 2 OF 9 HERITAGE IMPACT ASSESSMENT - MAY 2026 Heritage statement · 3 Aug 2026 View ↗ PDF PART 3 OF 9 HERITAGE IMPACT ASSESSMENT - MAY 2026 Heritage statement · 3 Aug 2026 View ↗ PDF PART 4 OF 9 HERITAGE IMPACT ASSESSMENT - MAY 2026 Heritage statement · 3 Aug 2026 View ↗ PDF PART 5 OF 9 HERITAGE IMPACT ASSESSMENT - MAY 2026 Heritage statement · 3 Aug 2026 View ↗ PDF PART 6 OF 9 HERITAGE IMPACT ASSESSMENT - MAY 2026 Heritage statement · 3 Aug 2026 View ↗ PDF PART 9 OF 9 HERITAGE IMPACT ASSESSMENT - MAY 2026 Heritage statement · 3 Aug 2026 View ↗ PDF PART 7 OF 9 HERITAGE IMPACT ASSESSMENT - MAY 2026 Heritage statement · 3 Aug 2026 View ↗ PDF PART 8 OF 9 HERITAGE IMPACT ASSESSMENT - MAY 2026 Heritage statement · 3 Aug 2026 View ↗ PDF PART 17 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 2 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 3 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 4 OF 7 ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 10 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 11 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 12 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 4 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 5 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 6 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 6 OF 7 ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 7 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 8 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 9 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 13 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 14 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 15 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 16 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 34 OF 34 ES VOL 3 APPENDICES - MAY 2026 CHAPTER 1 Environmental statement · 3 Aug 2026 View ↗ PDF PART 4 OF 34 ES VOL 3 APPENDICES - MAY 2026 2.2 EIA SC Environmental statement · 3 Aug 2026 View ↗ PDF PART 11 OF 34 ES VOL 3 APPENDICES - MAY 2026 CHAPTER 9 Environmental statement · 3 Aug 2026 View ↗ PDF PART 12 OF 34 ES VOL 3 APP MAY 2026 10.1 ARCHAEOLOGICAL DESK BASED ASSESSMENT Environmental statement · 3 Aug 2026 View ↗ PDF PART 13 OF 34 ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 1 OF 7 Environmental statement · 3 Aug 2026 View ↗ PDF PART 14 OF 34 ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 2 OF 7 Environmental statement · 3 Aug 2026 View ↗ PDF PART 15 OF 34 ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 3 OF 7 Environmental statement · 3 Aug 2026 View ↗ PDF PART 16 OF 34 ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 4 OF 7 Environmental statement · 3 Aug 2026 View ↗ PDF PART 17 OF 34 ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 5 OF 7 Environmental statement · 3 Aug 2026 View ↗ PDF PART 18 OF 34 ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 6 OF 7 Environmental statement · 3 Aug 2026 View ↗ PDF PART 19 OF 34 ES VOL 3 APP MAY 2026 11.1 FLOOD RISK ASSESSMENT PART 7 OF 7 Environmental statement · 3 Aug 2026 View ↗ PDF PART 20 OF 34 ES VOL 3 APP MAY 2026 12.1 DAYLIGHT AND SUNLIGHT DRAWINGS Environmental statement · 3 Aug 2026 View ↗ PDF PART 21 OF 34 ES VOL 3 APP MAY 2026 12.2 DRAWINGS OF WINDOWS ASSESSED PART 1 O Environmental statement · 3 Aug 2026 View ↗ PDF PART 22 OF 34 ES VOL 3 APP MAY 2026 12.2 DRAWINGS OF WINDOWS ASSESSED PART 2 O Environmental statement · 3 Aug 2026 View ↗ PDF PART 23 OF 34 ES VOL 3 APP MAY 2026 12.3 AND 12.4 DAYLIGHT AND SUNLIGHT ANALYS Environmental statement · 3 Aug 2026 View ↗ PDF PART 24 OF 34 ES VOL 3 APP MAY 2026 12.5 OVERSHADOWING ASSESSMENT Environmental statement · 3 Aug 2026 View ↗ PDF PART 5 OF 34 ES VOL 3 APP MAY 2026 2.3 INFORMAL EIA SCOPING REVIEW Environmental statement · 3 Aug 2026 View ↗ PDF PART 6 OF 34 ES VOL 3 APP MAY 2026 2.4 HEALTH IMPACT ASSESSMENT Environmental statement · 3 Aug 2026 View ↗ PDF PART 7 OF 34 ES VOL 3 APP MAY 2026 2.5 CUMULATIVE SCHEMES ASSESSED Environmental statement · 3 Aug 2026 View ↗ PDF PART 8 OF 34 ES VOL 3 APP MAY 2026 4.1 PLANNING APPLICATION DRAWINGS PART 1 Environmental statement · 3 Aug 2026 View ↗ PDF PART 9 OF 34 ES VOL 3 APP MAY 2026 4.1 PLANNING APPLICATION DRAWINGS PART 2 Environmental statement · 3 Aug 2026 View ↗ PDF PART 25 OF 34 ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 1 Environmental statement · 3 Aug 2026 View ↗ PDF PART 26 OF 34 ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 2 Environmental statement · 3 Aug 2026 View ↗ PDF PART 27 OF 34 ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 3 Environmental statement · 3 Aug 2026 View ↗ PDF PART 28 OF 34 ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 4 Environmental statement · 3 Aug 2026 View ↗ PDF PART 29 OF 34 ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 5 Environmental statement · 3 Aug 2026 View ↗ PDF PART 30 OF 34 ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 6 Environmental statement · 3 Aug 2026 View ↗ PDF PART 31 OF 34 ES VOL 3 APP MAY 2026 12.6 SOLAR GLARE SCEENING EXERCISE PART 7 Environmental statement · 3 Aug 2026 View ↗ PDF PART 32 OF 34 ES VOL 3 APP MAY 2026 12.7 SOLAR GLARE DETAILED ASSESSMENT PART Environmental statement · 3 Aug 2026 View ↗ PDF PART 33 OF 34 ES VOL 3 APP MAY 2026 12.7 SOLAR GLARE DETAILED ASSESSMENT PART Environmental statement · 3 Aug 2026 View ↗ PDF TRANSPORT ASSESSMENT - JULY 2026 Transport assessment · 3 Aug 2026 View ↗ PDF VENTILATION STATEMENT - JULY 2026 Vent/extraction statement · 3 Aug 2026 View ↗ PDF PART 1 OF 2 ENERGY STATEMENT - JULY 2026 Energy statement · 3 Aug 2026 View ↗ PDF PART 12 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 2 Environmental statement · 3 Aug 2026 View ↗ PDF PART 2 OF 2 ENERGY STATEMENT - JULY 2026 Energy statement · 3 Aug 2026 View ↗ PDF PART 3 OF 3 LONDON PLAN FIRE STATEMENT - JULY 2026 Fire Statement · 3 Aug 2026 View ↗ PDF PART 1 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20 Environmental statement · 3 Aug 2026 View ↗ PDF PART 1 OF 3 LONDON PLAN FIRE STATEMENT - JULY 2026 Fire Statement · 3 Aug 2026 View ↗ PDF PART 1 OF 4 UTILITIES ASSESSMENT REPORT - JULY 2026 Utilities statement · 3 Aug 2026 View ↗ PDF PART 2 OF 3 LONDON PLAN FIRE STATEMENT - JULY 2026 Fire Statement · 3 Aug 2026 View ↗ PDF PART 3 OF 3 LANDSCAPE DESIGN AND ACCESS STATEMENT - JUNE 2026 Landscaping and open space statement · 3 Aug 2026 View ↗ PDF PART 4 OF 4 UTILITIES ASSESSMENT REPORT - JULY 2026 Utilities statement · 3 Aug 2026 View ↗ PDF PART 1 OF 3 LANDSCAPE DESIGN AND ACCESS STATEMENT - JUNE 2026 Landscaping and open space statement · 3 Aug 2026 View ↗ PDF PART 2 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20 Environmental statement · 3 Aug 2026 View ↗ PDF PART 2 OF 4 UTILITIES ASSESSMENT REPORT - JULY 2026 Utilities statement · 3 Aug 2026 View ↗ PDF PART 3 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20 Environmental statement · 3 Aug 2026 View ↗ PDF PART 4 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20 Environmental statement · 3 Aug 2026 View ↗ PDF PART 3 OF 4 UTILITIES ASSESSMENT REPORT - JULY 2026 Utilities statement · 3 Aug 2026 View ↗ PDF PART 5 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20 Environmental statement · 3 Aug 2026 View ↗ PDF PART 6 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20 Environmental statement · 3 Aug 2026 View ↗ PDF PART 7 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20 Environmental statement · 3 Aug 2026 View ↗ PDF PART 8 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20 Environmental statement · 3 Aug 2026 View ↗ PDF PART 10 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 2 Environmental statement · 3 Aug 2026 View ↗ PDF PART 11 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 2 Environmental statement · 3 Aug 2026 View ↗ PDF PART 9 OF 12 GEO AND GEOENV PRELIMINARY RISK ASSESSMENT (DESK STUDY) - JUNE 20 Environmental statement · 3 Aug 2026 View ↗ PDF PART 1 OF 17 ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT - MAY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 1 OF 7 ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 2 OF 7 ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 3 OF 7 ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 5 OF 7 ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF PART 7 OF 7 ENVIRONMENTAL STATEMENT VOLUME 2 HTVIA - JULY 2026 Environmental statement · 3 Aug 2026 View ↗ PDF ECOLOGICAL IMPACT ASSESSMENT - JULY 2026 Biodiversity survey / ecology assessment · 3 Aug 2026 View ↗ PDF GATEWAY 1 FIRE STATEMENT - JULY 2026 Fire Statement · 3 Aug 2026 View ↗
PDF Commenter’s name hidden Show Statement of community involvement · 3 Aug 2026 View ↗
PDF PART 1 OF 2 CIRCULAR ECONOMY STATEMENT - JULY 2026 Economic statement · 3 Aug 2026 View ↗ PDF PART 2 OF 2 CIRCULAR ECONOMY STATEMENT - JULY 2026 Economic statement · 3 Aug 2026 View ↗ PDF PART 2 OF 3 LANDSCAPE DESIGN AND ACCESS STATEMENT - JUNE 2026 Landscaping and open space statement · 3 Aug 2026 View ↗

Plans & drawings 66

PDF 25001-MCO-XX-ZZ-DR-A-06304 REV P01 PROPOSED SECTION - 231-233 SOUTHWARK BRIDGE ROAD Plan - Proposed · 3 Sept 2026 View ↗ PDF 25001-MCO-XX-00-DR-A-06100 REV P06 PROPOSED LEVEL 00 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-01-DR-A-06101 REV P05 PROPOSED LEVEL 01 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-02-DR-A-06102 REV P05 PROPOSED LEVEL 02 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-03-DR-A-06103 REV P06 PROPOSED LEVEL 03 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-04-DR-A-06104 REV P05 PROPOSED LEVEL 04 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06301 REV P04 PROPOSED SECTION AA Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06302 REV P04 PROPOSED SECTION BB Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06303 REV P04 PROPOSED SECTION CC Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06400 REV P04 TYPICAL BAY ELEVATION 01 Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06401 REV P04 TYPICAL BAY ELEVATION 02 Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06402 REV P04 TYPICAL BAY ELEVATION 03 Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06403 REV P04 TYPICAL BAY ELEVATION 04 Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06404 REV P04 TYPICAL BAY ELEVATION 05 Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-05-DR-A-06105 REV P05 PROPOSED LEVEL 05 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-06-DR-A-06106 REV P05 PROPOSED LEVEL 06 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-07-DR-A-06107 REV P05 PROPOSED LEVEL 07 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-08-DR-A-06108 REV P05 PROPOSED LEVEL 08 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-09-DR-A-06109 REV P05 PROPOSED LEVEL 09 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-10-DR-A-06110 REV P05 PROPOSED LEVEL 10 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-11-DR-A-06111 REV P05 PROPOSED LEVEL 11 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-12-DR-A-06112 REV P05 PROPOSED LEVEL 12 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-13-DR-A-06113 REV P05 PROPOSED LEVEL 13 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-14-DR-A-06114 REV P05 PROPOSED LEVEL 14 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-15-DR-A-06115 REV P05 PROPOSED LEVEL 15 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-16-DR-A-06116 REV P05 PROPOSED LEVEL 16 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-17-DR-A-06117 REV P05 PROPOSED LEVEL 17 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-18-DR-A-06118 REV P05 PROPOSED LEVEL 18 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-20-DR-A-06120 REV P05 PROPOSED LEVEL 20 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-21-DR-A-06121 REV P05 PROPOSED LEVEL 21 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-22-DR-A-06122 REV P05 PROPOSED LEVEL 22 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-23-DR-A-06123 REV P05 PROPOSED LEVEL 23 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-24-DR-A-06124 REV P05 PROPOSED LEVEL 24 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-25-DR-A-06125 REV P05 PROPOSED LEVEL 25 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-26-DR-A-06126 REV P05 PROPOSED LEVEL 26 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-27-DR-A-06127 REV P05 PROPOSED LEVEL 27 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-28-DR-A-06128 REV P05 PROPOSED LEVEL 28 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-29-DR-A-06129 REV P05 PROPOSED LEVEL 29 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-30-DR-A-06130 REV P05 PROPOSED LEVEL 30 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-31-DR-A-06131 REV P05 PROPOSED LEVEL 31 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-19-DR-A-06119 REV P05 PROPOSED LEVEL 19 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-32-DR-A-06132 REV P05 PROPOSED LEVEL 32 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-33-DR-A-06133 REV P05 PROPOSED LEVEL 33 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-34-DR-A-06134 REV P04 PROPOSED LEVEL 34 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-35-DR-A-06135 REV P04 PROPOSED LEVEL 35 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-36-DR-A-06136 REV P04 PROPOSED LEVEL 36 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-37-DR-A-06137 REV P04 PROPOSED LEVEL 37 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-38-DR-A-06138 REV P04 PROPOSED LEVEL 38 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-39-DR-A-06139 REV P04 PROPOSED LEVEL 39 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-40-DR-A-06140 REV P04 PROPOSED LEVEL 40 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-41-DR-A-06141 REV P04 PROPOSED LEVEL 41 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-42-DR-A-06142 REV P04 PROPOSED LEVEL 42 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-43-DR-A-06143 REV P04 PROPOSED LEVEL 43 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-RF-DR-A-06145 REV P04 PROPOSED ROOF LEVEL Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-RF-DR-A-06146 REV P05 PROPOSED OVERRUN LEVEL Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-RF-DR-A-06150 REV P05 PROPOSED LEVEL 00-03 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06200 REV P05 PROPOSED NORTH ELEVATION Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06201 REV P06 PROPOSED WEST ELEVATION Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06202 REV P06 PROPOSED EAST ELEVATION Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-ZZ-DR-A-06203 REV P06 PROPOSED SOUTH ELEVATION Plan - Proposed · 3 Aug 2026 View ↗ PDF 25001-MCO-XX-44-DR-A-06144 REV P04 PROPOSED LEVEL 44 FLOOR PLAN Plan - Proposed · 3 Aug 2026 View ↗ PDF 25033-EXA-ZZ-GF-DR-L-00100 REV P06 LANDSCAPE GIA PLAN - GROUND FLOOR Landscaping details · 3 Aug 2026 View ↗ PDF 25033-EXA-ZZ-RF-DR-L-00101 REV P03 LANDSCAPE GIA PLAN - ROOF LEVELS Landscaping details · 3 Aug 2026 View ↗ PDF 25033-EXA-ZZ-RF-DR-L-00102 REV P04 LANDSCAPE GIA PLAN - ROOF TERRACE Landscaping details · 3 Aug 2026 View ↗ PDF LANDSCAPE DRAWING ISSUE REGISTER Landscaping details · 3 Aug 2026 View ↗ PDF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - JULY 2026 Construction Environmental Management Plan CEMP · 3 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 12

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Central Activities Zone · Elephant and Castle Major Town Centre. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: North Southwark and Roman Roads
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Elephant and Castle/ Walworth Road
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
National infrastructure project 921 m away: Thames Tideway Tunnel
The site is 921 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 38 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
3 listed buildings within 150 m; Inside the Southwark built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area93 m² (1,001 sq ft)
Energy ratingE (asset rating 106)
UseOffices and Workshop Businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in June 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Major application
Postcode
SE1 6NP
Received
3 Aug 2026
Validated
10 Sept 2026
Ward
St Georges
Parish
Borough, Bankside And Walworth
Case officer
Show
Target decision
31 Dec 2026
Agent
DP9 Ltd

Decision outlook

Day 49 of the 56-day target. Southwark usually decides changes of use by day 55.

Day 497 days to the 56-day target
60%decided within 8 weeks
79%approved
78decided in the last year

Plota live figures for changes of use decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

9comments received
9 objecting

100% object · above the UK average of 74%

1,103 neighbours consulted · Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
31 Dec 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Major dwellings

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.