Village Hall Ferry Lane Postwick Norfolk NR13 5HL Data via plota.co.uk

2026/3041 - Full Pending Consideration

Proposal

Car park extension and alterations. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Oct 2026
✓
Consultation
23 Oct 2026
Decision
Expected by 4 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 6 Dec 2026 and 28 Dec 2026, from South Norfolk Broadland's recent commercial and major works.

Comments are open until 13 Nov 2026

Comment on this application ↗

Site constraints 7

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 513 m away: Norwich Northern Distributor Road (NDR)
The site is 513 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National park 129 m away: The Broads; Radon affected area, class 2; Inside the Postwick built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 23 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR13 5HL
Received
9 Oct 2026
Validated
9 Oct 2026
Ward
Brundall
Parish
Postwick (Witton)
Case officer
Show
Target decision
4 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
Paul Robinson Partnership (UK) LLP

Decision outlook

Day 19 of the 56-day target. South Norfolk Broadland usually decides commercial and major works by day 72.

Day 1953 days to the predicted decision (day 72)
33%decided within 8 weeks
96%approved
8%go to committee

Plota live figures for commercial and major works decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

7 neighbours consulted · Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15185247
Planning Portal ref
PP-15185247
Neighbours
23 Oct 2026
Consultation
23 Oct 2026
Comments by
13 Nov 2026
Statutory expiry
4 Dec 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026