Land East And West Of Manteo Way Manteo Way East The Water Devon Data via plota.co.uk

1/0073/2026/DIS - Discharge of Conditions Awaiting Decision

Proposal

Discharge of condition 5 (lighting) of planning approval Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Aug 2026
✓
Consultation
25 Aug 2026
Decision
Target date was 16 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 16 Oct 2026.

The consultation period closed on 18 Sept 2026.

Associated applications 3

  • Part of

    Reserved mattersApprovedcouncil archive

    Conditions 5 awaiting decision

Site constraints 4

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: 9 m away (reference 246126-006).
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Agricultural land, grade 3b, surveyed
Not best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Bristol). Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Also on the record
Radon affected area, class 2; National infrastructure project 641 m away: Xlinks Morocco-UK Power Project.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Torridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Torridge
Application type
Discharge of Conditions
Received
21 Aug 2026
Validated
21 Aug 2026
Ward
Bideford East
Parish
Bideford
Case officer
Show
Target decision
16 Oct 2026
Applicant
Show

Public comments

No public comments yet.

Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15176027
Planning Portal ref
PP-15176027
Consultation
25 Aug 2026
Comments by
18 Sept 2026
Statutory expiry
16 Oct 2026
Env. assessment
No
Torridge
Planning Authority Score
7.6/10
Good
#40 of 296 councils
Relevant to this application:
Householder decisions

Torridge is faster than most councils at deciding householder applications, ranking #55 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Torridge decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #184 of 296
98%
Householder approved
Above avg (90%) #25 of 296
78%
Decided in 8 weeks
Above avg (63%) #55 of 296
38%
Extended time limit
Below avg (41%) #133 of 296
72%
Minor dwellings approved
155 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
82%
Change of use approved
11 decided
554
Total decisions
71 refused in the year to March 2026