Land At Grid Reference 234599 104589 Holsworthy Devon Data via plota.co.uk

1/0090/2025/DIS - Discharge of Conditions Application is being considered

Proposal

Partial discharge of condition 8 of planning approval (Highway Phasing J) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Aug 2025
✓
Consultation
1 Aug 2025
Decision
Target date was 26 Sept 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 29 Oct 2026; it is now day 454.

The consultation period closed on 25 Aug 2025.

Site constraints 3

Agricultural land, grade 3b, surveyed
Not best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Bristol). Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 16 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Torridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Torridge
Application type
Discharge of Conditions
Received
1 Aug 2025
Validated
1 Aug 2025
Ward
Holsworthy
Parish
Holsworthy
Case officer
Show
Target decision
26 Sept 2025
Applicant
Show

Decision outlook

Day 454, past the statutory target. 89% of discharge of conditions in Torridge are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 24 Oct 2026.

Day 454398 days past the 56-day target
71%decided within 8 weeks
96%approved
104decided in the last year

Plota live figures for discharge of conditions decided by Torridge in the last twelve months, from validation. Torridge decision record →

Public comments

No public comments yet.

Last counted 24 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14199838
Planning Portal ref
PP-14199838
Consultation
1 Aug 2025
Comments by
25 Aug 2025
Statutory expiry
26 Sept 2025
Env. assessment
No
Torridge
Planning Authority Score
7.6/10
Good
#40 of 296 councils
Relevant to this application:
Householder decisions

Torridge is faster than most councils at deciding householder applications, ranking #55 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Torridge decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #184 of 296
98%
Householder approved
Above avg (90%) #25 of 296
78%
Decided in 8 weeks
Above avg (63%) #55 of 296
38%
Extended time limit
Below avg (41%) #133 of 296
72%
Minor dwellings approved
155 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
82%
Change of use approved
11 decided
554
Total decisions
71 refused in the year to March 2026