28 High Street, Warminster, BA12 9AF Data via plota.co.uk

PL/2026/05184 - Listed building consent Approved

Proposal

Refurbishment and redecoration of shopfront, including a new fascia and signage. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
Approved
12 Oct 2026

Approved on 12 Oct 2026 · Last checked 15 Oct 2026

Site constraints 4

43 listed buildings within 150 m of the postcode pin
Nearest: The Chantry, Grade II*, about 14 m from the postcode pin · 1 Grade II*, 42 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 43 with distances
Historic England ↗
Nutrient neutrality catchment: River Avon SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Warminster conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Inside the Warminster built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area96 m² (1,033 sq ft)
Energy ratingC (asset rating 64)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in January 2026, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Wiltshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wiltshire
Application type
Listed building consent
Postcode
BA12 9AF
Received
17 Aug 2026
Validated
17 Aug 2026
Ward
Warminster East ED
Parish
Warminster CP
Case officer
Show
Target decision
12 Oct 2026
Decision
Approve with Conditions
Decision date
12 Oct 2026

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 97% of listed building works here are.

53%decided within 8 weeks
97%approved
637decided in the last year

Plota live figures for listed building works decided by Wiltshire in the last twelve months, from validation. Wiltshire decision record →

Public comments

No public comments yet.

Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
9 Oct 2026
Wiltshire
Planning Authority Score
3.9/10
Below average
#203 of 296 councils
Relevant to this application:
Other decisions

Wiltshire is slower than most councils at deciding householder applications, ranking #225 out of 296. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wiltshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #71 of 296
96%
Householder approved
Above avg (90%) #65 of 296
53%
Decided in 8 weeks
Below avg (63%) #225 of 296
55%
Extended time limit
Above avg (41%) #252 of 296
78%
Minor dwellings approved
339 decided (1-9 homes)
90%
Major dwellings approved
48 decided (10+ homes)
92%
Change of use approved
160 decided
3,659
Total decisions
256 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.