26 Spring Walk, London, E1 5JA Data via plota.co.uk

PA/26/01612/NC - Full Planning Permission Registered

Proposal

Proposed change of use from small HMO (Class C4) to large HMO (Sui Generis), including the installation of two windows to the rear and side elevations. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 19 Oct 2026
Decision
Expected by 14 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 14 Dec 2026, from Tower Hamlets's recent changes of use.

Site constraints 9

Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 886 m away: Thames Tideway Tunnel
The site is 886 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 1058 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
3 listed buildings within 150 m; Wider setting of protected view 25A.1 City Hall to the White Tower; Conservation area 81 m away: Fournier Street; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre 97 m away: Whitechapel.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 24 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £720,000 in July 2025. Terraced house, freehold.

23 July 2025£720,000Recorded as a transfer outside a standard sale
31 March 2021£600,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area100 m² (1,076 sq ft)
Energy ratingC (72 out of 100), could reach B
PropertySemi-detached house, 6 habitable rooms
Built1976 to 1982
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, partial insulation (assumed)

From the energy performance certificate lodged in November 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E1 5JA
Received
around 19 Oct 2026
Validated
19 Oct 2026
Ward
Spitalfields and Banglatown
Case officer
Show
Target decision
14 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
Abdul karim & Sons LTD
Freehold owner
Show

Decision outlook

Day 9 of the 56-day target. Tower Hamlets usually decides changes of use by day 56.

Day 947 days to the 56-day target
66%decided within 8 weeks
55%approved
52decided in the last year

Plota live figures for changes of use decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Statutory expiry
14 Dec 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Change of use

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.