6 Grassfield Avenue, SALFORD, M7 1HW Data via plota.co.uk

PA/2026/1005 - Lawful development Approved

Proposal

Application for a lawful development certificate for existing use as a 5 bedroom 5 person House in Multiple Occupation (HMO) (use class C4) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Jul 2026
✓
Approved
10 Sept 2026

Approved on 10 Sept 2026 · Delegated Decision · Last checked 24 Sept 2026

Documents 72

Other documents 48

PDF Abode Invoice 858.pdf PDF · 16 Jul 2026 View ↗ PDF Gas Safety Record 2025 PDF · 16 Jul 2026 View ↗ PDF Fire Inspection Quote PDF · 16 Jul 2026 View ↗ PDF Quarterly Inspection 2021 PDF · 16 Jul 2026 View ↗ PDF Notice 2 No Access to Meter Gas Control 21 08 2024.pdf PDF · 16 Jul 2026 View ↗ PDF Fire Detection and Alarm System.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 448.pdf PDF · 16 Jul 2026 View ↗ PDF Fire Detection and Alarm System 2.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 1137.pdf PDF · 16 Jul 2026 View ↗ PDF Quarterly Inspection 2020 PDF · 16 Jul 2026 View ↗ PDF Electrical Installation Condition Report 2025 PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 956.pdf PDF · 16 Jul 2026 View ↗ PDF Gas Safety Record 2020 PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 705.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 1512.pdf PDF · 16 Jul 2026 View ↗ PDF Fire Extinguishers 22 10 2025 FireflyFireProtectionFET.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 161.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 1569.pdf PDF · 16 Jul 2026 View ↗ PDF Fire Inspection Report 2023 PDF · 16 Jul 2026 View ↗ PDF Gas Safety Record 2024.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 1435.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 1282.pdf PDF · 16 Jul 2026 View ↗ PDF Gas Safety Record 2022 PDF · 16 Jul 2026 View ↗ PDF Fire Inspection Report 2021 PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 561.pdf PDF · 16 Jul 2026 View ↗ PDF Electrical Installation Condition Report PDF · 16 Jul 2026 View ↗ PDF Fire Detection and Alarm System 1.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 509.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 223.pdf PDF · 16 Jul 2026 View ↗ PDF Quarterly Inspection 2022 PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 1061.pdf PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 1196.pdf PDF · 16 Jul 2026 View ↗ PDF Gas Safety Record 2025 PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 1346.pdf PDF · 16 Jul 2026 View ↗ PDF Quarterly Inspection 2026 PDF · 16 Jul 2026 View ↗ PDF HMO License 2021 PDF · 16 Jul 2026 View ↗ PDF Fire Detection and Alarm System 3.pdf PDF · 16 Jul 2026 View ↗ PDF Safety Inspection 2026 PDF · 16 Jul 2026 View ↗ PDF Gas Safety Record 2023 PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 808.pdf PDF · 16 Jul 2026 View ↗ PDF Quarterly Inspection 2020 PDF · 16 Jul 2026 View ↗ PDF Check-in Inspection 2017 PDF · 16 Jul 2026 View ↗ PDF Quarterly Inspection 2023 PDF · 16 Jul 2026 View ↗ PDF Abode Invoice 1025.pdf PDF · 16 Jul 2026 View ↗ PDF Gas Safety Record 2022 PDF · 16 Jul 2026 View ↗ PDF HMO License 2016 PDF · 16 Jul 2026 View ↗ PDF Quote Fire Extinguishers and Blanket 2025 PDF · 16 Jul 2026 View ↗ PDF Fire Alarm 14 11 2025.pdf PDF · 16 Jul 2026 View ↗

All documents on the council site ↗

Site constraints 7

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Cliff conservation area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
2018 HMO Article 4 Direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Heritage at risk: Cliff, Higher Broughton
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Also on the record
Coalfield, development low risk area; 1 listed building within 150 m of the postcode pin; Inside the Salford built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £135,000 in August 2015. Semi-detached house, freehold.

3 August 2015£135,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area119 m² (1,281 sq ft)
Energy ratingE (54 out of 100), could reach C
PropertySemi-detached house, 6 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in July 2019, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Salford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Salford
Application type
Lawful development
Postcode
M7 1HW
Received
16 Jul 2026
Validated
16 Jul 2026
Ward
Broughton Ward
Target decision
10 Sept 2026
Decision
Approve
Decision date
10 Sept 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
20 Aug 2026
Salford
Planning Authority Score
3.9/10
Below average
#200 of 296 councils
Relevant to this application:
Householder decisions

Salford is slower than most councils at deciding householder applications, ranking #206 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Salford decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #115 of 296
95%
Householder approved
Above avg (90%) #90 of 296
56%
Decided in 8 weeks
Below avg (63%) #206 of 296
53%
Extended time limit
Above avg (41%) #243 of 296
70%
Minor dwellings approved
40 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
77%
Change of use approved
75 decided
737
Total decisions
76 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.