Roof plant equipment at Building 2, Chiswick Park, Chiswick, London W4
Summary of planning committee decision
Decided by Hounslow Planning Committee on 6 Nov 2025.
What was proposed
The application proposed replacing and installing rooftop plant equipment, power cabling and acoustic enclosures for buildings 1 to 5.
“Address: Buildings 1-5 Chiswick Park, 566 Chiswick High Road, Chiswick, W4 5BE Ward: Chiswick Gunnersbury Proposal: Installation of plant equipment with associated power cabling and replacement of existing plant equipment at roof level of the building Application validated: 07 August 2025 These applications are presented to the Planning Committee following a request from Councillor Joanna Biddolph.”
“HISTORY Building 1 P/2012/1302 Installation of plant including one generator in blockwork enclosure, two chillers, one buffer vessel and ancillary works. Approved 12/07/2012 Building 2 P/2019/1741 Installation of two motorised antennae and four fixed antennae to the roof Approved 03/07/2019 Building 3 P/2001/2838 Installation of satellite dish on roof of existing building Approved 28/11/2001 Building 4 P/2011/2939 Installation of eleven new condenser units, diesel tank…”
Officer report
The site
The site is within a business park beside the railway, station and nature reserve, and the buildings mainly contain offices and cafés.
“Figure 1 Site Location Plan 2.1 The application site is located within Chiswick Business Park which is a Key Existing Office Location immediately north of Chiswick High Street. The site adjoins the London Overground Gunnersbury railway triangle with Gunnersbury station immediately south and Gunnersbury Triangle Nature Reserve to the east. The site is close to the Chiswick Town Centre and its Primary Shopping Frontage is located to the east of the site.”
Officer report
Who spoke
A society chair spoke against without stronger protection, while the estate’s development manager supported the application and its noise assessment.
Members’ debate
Members recognised residents’ concerns, noted the report’s satisfactory noise assessment and discussed testing and permanent maintenance requirements.
“During the debate Cllr Tom Bruce stated that it was important to recognise the concerns of the objectors but the report stated that noise levels had been deemed satisfactory. The proposed scheme was a step to reduce carbon and create a sustainable future.”
“[name withheld] reminded Members that the Application was split into five parts but if Members were minded they could, with Chair’s approval, vote on all five at once. Members voted unanimously to vote on all five together as all were covered by the report and debate.”
Minutes
The vote
Members voted unanimously to consider all five applications together and unanimously supported approval.
“Cllr Sayyar Raza moved approval of the Applications, seconded by Cllr Marina Sharma. Members voted unanimously to approve the Applications.”
Minutes
Sources
- Hounslow Planning Committee minutes, 6 November 2025
- Agenda and papers (council website)
Source: Plota analysis of Hounslow's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Hounslow Planning Committee
- Council
- Hounslow
- Date
- Thursday 6 November 2025
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Vote
- Unanimous
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- Hounslow committee decisions →
This committee's year
19 decisions in the 12 months to this meeting.
Source: Plota analysis of the committee's minutes.