20261032 - Telecommunication Works Pending Consideration

Proposal

The Telecommunications Act 1984 as Amended by Schedule 3 to the Communications Act 2003. The Town and Country Planning (General Permitted Development) (England) Order 2015 [SI 2015, No. 596] as further amended by the Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2016 [SI 2016, No. 1040] - Part 16 of Schedule 2 Communications, Class A (Electronic Communications Code Operators) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Oct 2026
Decision
Expected by 30 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Oct 2026 and 13 Nov 2026, from Gravesham's recent prior approvals.

Site constraints 8

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Thong, Shorne Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project: Lower Thames Crossing
The site is inside the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 186 m away: Shorne and Ashenbank Woods SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 2; National landscape about 382 m away: Kent Downs.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 21 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gravesham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gravesham
Application type
Telecommunication Works
Received
9 Oct 2026
Validated
9 Oct 2026
Ward
Westcourt
Case officer
Show
Target decision
30 Oct 2026
Applicant
Show

Decision outlook

Day 19 of the 56-day target. Gravesham usually decides prior approvals by day 28.

Day 1937 days to the 56-day target
96%decided within 8 weeks
82%approved
91decided in the last year

Plota live figures for prior approvals decided by Gravesham in the last twelve months, from validation. Gravesham decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
GILL-X-BD05
Statutory expiry
30 Oct 2026
Env. assessment
No
Gravesham
Planning Authority Score
4.4/10
Below average
#180 of 296 councils
Relevant to this application:
Householder decisions

Gravesham ranks #104 out of 296 councils for householder decision speed. Gravesham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Gravesham decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #287 of 296
78%
Householder approved
Below avg (90%) #286 of 296
72%
Decided in 8 weeks
Above avg (63%) #104 of 296
36%
Extended time limit
Below avg (41%) #110 of 296
58%
Minor dwellings approved
64 decided (1-9 homes)
50%
Major dwellings approved
6 decided (10+ homes)
65%
Change of use approved
34 decided
619
Total decisions
156 refused in the year to March 2026