Corringham Water Recycling Centre, Land Off Springthorpe Road, Corringham, Data via plota.co.uk

WL/2026/00857 - Local Authority Consultation Determined

Proposal

Local authority consultation - - Application for approval of details reserved by Conditions 3 (Construction Environmental Management Plan), 4 (Biodiversity Net Gain), 5 (Habitat Management and Monitoring Plan), and 7 (Hedgerow Removal) of planning permission number WL/2026/00096 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Sept 2026
Decision
Target date was 30 Sept 2026

Under consideration

No decision has been issued yet. A decision is expected by 30 Sept 2026.

Site constraints 4

Potentially contaminated land
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 860 m away: Tillbridge Solar Project
The site is 860 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Cottam Solar Project (decided, 1088 m); H2East Pipeline: Humber to Nottinghamshire (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Potentially contaminated landCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Local Authority Consultation
Received
16 Sept 2026
Validated
16 Sept 2026
Ward
HEMSWELL
Parish
Corringham CP
Case officer
Show
Target decision
30 Sept 2026
Decision level
Delegated
Applicant
Show

Consultation & key dates

Alt. reference
EC/2026/00895
Committee
18 Sept 2026
Statutory expiry
30 Sept 2026
Env. assessment
No
West Lindsey
Planning Authority Score
5.3/10
Average
#134 of 296 councils
Relevant to this application:
Householder decisions

West Lindsey ranks #110 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
West Lindsey decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #70 of 296
94%
Householder approved
Above avg (90%) #123 of 296
72%
Decided in 8 weeks
Above avg (63%) #110 of 296
44%
Extended time limit
Above avg (41%) #187 of 296
88%
Minor dwellings approved
80 decided (1-9 homes)
100%
Major dwellings approved
25 decided (10+ homes)
94%
Change of use approved
33 decided
562
Total decisions
39 refused in the year to March 2026