Land South East of Queensway and Kilnhouse Lane Junction Lytham St Annes FY8 3FY Data via plota.co.uk

26/0194 - Advertisement Consent Withdrawn

Proposal

Advertisement consent for installation of non-illuminated triple-width, pole-mounted marketing sign to replace existing sign Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Mar 2026
✓
Validated
16 Jun 2026
−
Withdrawn
22 Sept 2026

Withdrawn on 22 Sept 2026 · Delegated · Last checked 27 Sept 2026

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 3b, surveyed
Not best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Wolverhampton). Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
National infrastructure project about 480 m away: Morgan and Morecambe Offshore Wind Farms Transmission Assets
The site is about 480 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Lytham St Anne's built-up area; Priority habitat about 20 m away: Coastal and floodplain grazing marsh; Green belt about 54 m away: Blackpool.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Fylde - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fylde
Application type
Advertisement Consent
Postcode
FY8 3FY
Received
25 Mar 2026
Validated
16 Jun 2026
Ward
Kilnhouse New
Parish
St Anne's on the Sea
Case officer
Show
Decision
Withdrawn by Applicant
Decision date
22 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
Rowland Homes

Consultation & key dates

Consultation
18 Jun 2026
Comments by
9 Jul 2026
Fylde
Planning Authority Score
5.3/10
Average
#130 of 296 councils
Relevant to this application:
Other decisions

Fylde ranks #184 out of 296 councils for householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Fylde decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #11 of 296
98%
Householder approved
Above avg (90%) #17 of 296
60%
Decided in 8 weeks
Below avg (63%) #184 of 296
49%
Extended time limit
Above avg (41%) #220 of 296
79%
Minor dwellings approved
43 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
100%
Change of use approved
28 decided
422
Total decisions
16 refused in the year to March 2026