Part Verge Opposite The Lions Sandy Lane Woodbridge Suffolk Data via plota.co.uk

DC/26/2913/CON - Other Consultation Awaiting decision

Proposal

Consultation - Install fixed line broadband electronic communications apparatus under Regulation 5, detailed as 10m light pole at the above location. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
Decision
Expected by 7 Sept 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 11 Oct 2026 and 19 Oct 2026, from East Suffolk's recent utility and infrastructure works.

Site constraints 5

National infrastructure project about 216 m away: East Anglia THREE Offshore Wind Farm
The site is about 216 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; National landscape about 418 m away: Suffolk Coast & Heaths; Inside the Woodbridge built-up area; Priority habitat about 38 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Other Consultation
Received
17 Aug 2026
Validated
17 Aug 2026
Ward
Woodbridge
Parish
Woodbridge
Target decision
7 Sept 2026
Applicant
Show

Decision outlook

Day 53 of the 56-day target. East Suffolk usually decides utility and infrastructure works by day 56.

Day 533 days to the 56-day target
52%decided within 8 weeks
100%approved
13%go to committee

Plota live figures for utility and infrastructure works decided by East Suffolk in the last twelve months, from validation. East Suffolk decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
7 Sept 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 councils
Relevant to this application:
Householder decisions

East Suffolk ranks #183 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026