Land West Of Mobbs Way Oulton Suffolk Data via plota.co.uk

DC/25/3168/DRC - Approval of Details Reserved by Cond. Awaiting decision

Proposal

Discharge of Condition No.7 of - Approval of Reserved Matters for 73 Dwellings Phase 3B pursuant to application - (Variation of Condition 31 and Removal of Condition 44 of (Formerly - Outline Application for a mixed-use development comprising of residential, neighbourhood shopping centre, community hall, primary school, play areas and country park)) - Details of the estate roads and footpaths (including layout, levels, gradients, surfacing, lighting, traffic calming and means of surface water drainage) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Aug 2025
Decision
Target date was 9 Oct 2025

Under consideration

No decision has been issued yet. A decision is expected by 9 Oct 2025.

Documents 35

Plans & drawings 22

PDF SL01/0001/S38/OULTONWOODSMEADOWSPINEPH3 APPROVED STREET LIGHTING DESIGN REVISED Drawing · 30 Sept 2025 View ↗ PDF 0100 P4 HIGHWAY HORIZONTAL SETTING OUT Drawing · 14 Aug 2025 View ↗ PDF 0101 P3 ADOPTABLE JUNCTION SETTING OUT Drawing · 14 Aug 2025 View ↗ PDF 0200 P2 ENGINEERING LONGSECTIONS SHEET 1 Drawing · 14 Aug 2025 View ↗ PDF 0201 P1 ENGINEERING LONGSECTIONS SHEET 2 Drawing · 14 Aug 2025 View ↗ PDF 0202 P2 ENGINEERING LONGSECTIONS SHEET 3 Drawing · 14 Aug 2025 View ↗ PDF 0203 P2 ENGINEERING LONGSECTIONS SHEET 4 Drawing · 14 Aug 2025 View ↗ PDF 0400 P1 ADOPTABLE HIGHWAY CONSTRUCTION DETAILS SHEET 1 Drawing · 14 Aug 2025 View ↗ PDF 0401 P1 ADOPTABLE HIGHWAY CONSTRUCTION DETAILS SHEET 2 Drawing · 14 Aug 2025 View ↗ PDF 0402 ADOPTABLE HIGHWAY CONSTRUCTION DETAILS SHEET 3 Drawing · 14 Aug 2025 View ↗ PDF 0050 P4 ENGINEERING LAYOUT Drawing · 14 Aug 2025 View ↗ PDF 0055 P4 S38 EXTENTS OF ADOPTION Drawing · 14 Aug 2025 View ↗ PDF 0060 P4 S104 PLAN Drawing · 14 Aug 2025 View ↗ PDF 1100 P3 PRIVATE EXTERNAL WORKS GA SHEET 1 Drawing · 14 Aug 2025 View ↗ PDF 1101 P4 PRIVATE EXTERNAL WORKS GA SHEET 2 Drawing · 14 Aug 2025 View ↗ PDF 1102 P5 PRIVATE EXTERNAL WORKS GA SHEET 3 Drawing · 14 Aug 2025 View ↗ PDF 1200 P2 BASIN SECTIONS Drawing · 14 Aug 2025 View ↗ PDF 0204 P2 ENGINEERING LONGSECTIONS SHEET 5 Drawing · 14 Aug 2025 View ↗ PDF 0205 P1 ENGINEERING LONGSECTIONS SHEET 6 Drawing · 14 Aug 2025 View ↗ PDF 0300 P3 MANHOLE SCHEDULES Drawing · 14 Aug 2025 View ↗ PDF 0301 P2 MANHOLE SCHEDULES Drawing · 14 Aug 2025 View ↗ PDF 1103 P4 PRIVATE EXTERNAL WORKS GA SHEET 4 Drawing · 14 Aug 2025 View ↗

Consultation & comments 4

PDF SCC LOCAL HIGHWAY AUTHORITY Consultee Comment · 21 Oct 2025 View ↗ PDF SCC LOCAL HIGHWAY AUTHORITY Consultee Comment · 8 Sept 2025 View ↗
PDF Commenter’s name hidden Show Public Comment · 29 Aug 2025 View ↗
PDF Commenter’s name hidden Show Public Comment · 29 Aug 2025 View ↗

All documents on the council site ↗

Site constraints 4

Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project 1958 m away: Lake Lothing Third Crossing; Inside the Lowestoft built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 13 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details Reserved by Cond.
Received
14 Aug 2025
Validated
14 Aug 2025
Ward
Oulton Broad
Parish
Oulton
Case officer
Show
Target decision
9 Oct 2025
Applicant
Show

Public comments

1comment received
1 objecting

Last counted 21 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
9 Oct 2025
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 councils
Relevant to this application:
Major dwellings

East Suffolk ranks #183 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026