2025/00510/LBC - Listed Building Consent application Approved

Proposal

LBC for replacement of porch, roof covering, guttering and works to chimney. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 May 2025
✓
Validated
6 Sept 2025
✓
Approved
5 Feb 2026

Approved on 5 Feb 2026 · Delegated · Last checked 12 Oct 2026

Site constraints 4

10 listed buildings within 150 m of the postcode pin
Nearest: Front Garden Wall to West Farm, Grade II, about 13 m from the postcode pin · 1 Grade II*, 9 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 10 with distances
Cadw ↗
Llantwit Major conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Scheduled monument about 107 m away: Llantwit Major Castle
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3

Checked on 12 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Glamorgan - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Glamorgan
Application type
Listed Building Consent application
Received
27 May 2025
Validated
6 Sept 2025
Ward
Llantwit Major
Parish
Llantwit Major Town Council
Case officer
Show
Target decision
1 Nov 2025
Decision
Approved
Decision date
5 Feb 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 152 days from validation, 66 days slower than Glamorgan's median of 86 for listed building consent. Approved, as 100% of listed building consent here are.

23%decided within 8 weeks
100%approved
26decided in the last year

Plota live figures for listed building consent decided by Glamorgan in the last twelve months, from validation. Glamorgan decision record →

Consultation & key dates

Comments by
20 Nov 2025
Committee
5 Feb 2026