Edgware Community Hospital Burnt Oak Broadway Edgware HA8 0AD Data via plota.co.uk

Pending 25/3616/RMA
Council
Date received
2 Sept 2025
Date validated
2 Sept 2025
Postcode
HA8 0AD
Freehold owner

Description

Reserved matters application in respect of details relating to scale, layout, appearance and landscaping pursuant to condition 2 of planning permission ref. (as amended) for the demolition of existing buildings and phased redevelopment of the site to provide 122 residential units (Use Class C3), flexible use commercial floorspace (Use Class E) in buildings of up to 6 storeys along with the provision of associated car parking, landscaping and amenity space and the discharge of conditions 9 (Bat Survey) and 12 (Phasing Plan) Data via plota.co.uk

Last checked

Decision outlook

Plota predicted a decision around 28 Oct 2026; it is now day 421.

Day 421, past the statutory target. 49% of reserved matters in Barnet are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 12 Oct 2026.

Day 421330 days past the 91-day target
27%decided within 8 weeks
96%approved
12%go to committee

Plota live figures for reserved matters decided across the UK in the last twelve months, from validation; too few recent reserved matters in Barnet to go on. Barnet decision record →

Associated applications 9

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Article 4 Small Houses in Multiple Occupation (HMO) Area 1. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Barnet AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Barnet built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Flood defence 38 m away (engineered high ground, designed for a 1 in 10 year flood).
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area18,399 m² (198,045 sq ft)
Energy ratingB (asset rating 44)
UseResidential Institutions: Hospitals and Care Homes
HeatingHeating and Mechanical Ventilation

From the energy performance certificate lodged in May 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Barnet - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Barnet
Planning Authority Score
6.2/10
Average
#90 of 296 councils
Relevant to this application:
Householder decisions

Barnet is faster than most councils at deciding householder applications, ranking #42 out of 296. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Barnet is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Barnet decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #285 of 296
82%
Householder approved
Below avg (90%) #264 of 296
79%
Decided in 8 weeks
Above avg (63%) #42 of 296
25%
Extended time limit
Below avg (41%) #29 of 296
55%
Minor dwellings approved
319 decided (1-9 homes)
90%
Major dwellings approved
21 decided (10+ homes)
41%
Change of use approved
132 decided
2,541
Total decisions
625 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.