Grange Farm, BLACKWOOD HILL LANE, GRATTON, ENDON, STAFFORDSHIRE, ST9 9AH Data via plota.co.uk

SMD/2026/0430 - Full - Householder Invalid application

Proposal

Internal and external alterations to dwelling including demolition of outdoor WC erection of front porch and single storey rear extension Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Nov 2026 and 24 Nov 2026, from Staffordshire Moorlands's recent extensions.

The consultation period closed on 6 Oct 2026.

Site constraints 5

Green belt: Stoke-on-Trent
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Also on the record
3 listed buildings within 150 m of the postcode pin; Radon affected area, class 2; Priority habitat about 16 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 16 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Staffordshire Moorlands - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full - Householder
Postcode
ST9 9AH
Received
15 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Sammons Architectural Limited

Decision outlook

Day 43 of the 56-day target. Staffordshire Moorlands usually decides extensions by day 62.

Day 4319 days to the predicted decision (day 62)
41%decided within 8 weeks
80%approved
168decided in the last year

Plota live figures for extensions decided by Staffordshire Moorlands in the last twelve months, from validation. Staffordshire Moorlands decision record →

Consultation & key dates

Comments by
6 Oct 2026
Staffordshire Moorlands
Planning Authority Score
0.4/10
Poor
#296 of 296 councils
Relevant to this application:
Householder decisions

Staffordshire Moorlands is one of the slowest councils in England for householder decisions, ranking #277 out of 296. The council extends the time limit on 66% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Staffordshire Moorlands is also one of the strictest councils - it refuses more householder applications than almost any other, with only 76% approved vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Staffordshire Moorlands decision statistics
Based on MHCLG data, the year to March 2026
76%
Overall approval rate
Below avg (87%) #283 of 296
76%
Householder approved
Below avg (90%) #292 of 296
36%
Decided in 8 weeks
Below avg (63%) #277 of 296
66%
Extended time limit
Above avg (41%) #280 of 296
59%
Minor dwellings approved
41 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
75%
Change of use approved
36 decided
396
Total decisions
94 refused in the year to March 2026