254-268 Camberwell Road London SE5 0DP Data via plota.co.uk

26/AP/3086 - Section 106 - Satisfying an obligation Under consideration/assessment

Proposal

Details submitted to satisfy Schedule 3 Paragraph 3.1 (Energy Strategy) of the Section 106 Agreement associated with planning permission ref: Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Oct 2026
✓
Validated
22 Oct 2026
Decision
Expected by 16 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 16 Dec 2026.

Site constraints 10

Grade II listed: Regal Cinema
List entry 1378453 · The pin is inside its outline
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Tree preservation order: 254-270 Camberwell Road
Consent is needed before work on protected trees. A single protected tree within 15 m, nearest 13 m.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project 1405 m away: Thames Tideway Tunnel; Conservation area 78 m away: Camberwell Green; Inside the Southwark built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre 25 m away: Camberwell.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 27 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Section 106 - Satisfying an obligation
Postcode
SE5 0DP
Received
19 Oct 2026
Validated
22 Oct 2026
Ward
Camberwell Green
Case officer
Show
Target decision
16 Dec 2026
Applicant
Show
Agent
The Boisot Waters Cohen Partnership

Public comments

No public comments yet.

Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
16 Dec 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026