135 - 137 Botley Road Oxford Oxfordshire Data via plota.co.uk

22/03076/CND12 - Discharge Condition - 12th app Registered

Proposal

Details submitted in compliance with Condition 12 (CCTV) of planning permission . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2026
Decision
Expected by 24 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 24 Nov 2026.

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Houses in Multiple Occupation Article 4 Direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: The City of Oxford
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Flood defence about 12 m from the postcode pin (natural high ground, designed for a 1 in 2 year flood); National infrastructure project about 707 m away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application; Inside the Oxford built-up area; Green belt about 72 m away: Oxford.
Not affected
No scheduled monument at the site

Checked on 7 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Oxford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Oxford
Application type
Discharge Condition - 12th app
Received
29 Sept 2026
Validated
29 Sept 2026
Ward
Osney And St. Thomas Ward
Target decision
24 Nov 2026
Decision level
Delegated decision
Applicant
Show

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15258649
Planning Portal ref
PP-15258649
Statutory expiry
24 Nov 2026
Env. assessment
No
Oxford
Planning Authority Score
1.8/10
Poor
#277 of 296 councils
Relevant to this application:
Householder decisions

Oxford is slower than most councils at deciding householder applications, ranking #261 out of 296. The council extends the time limit on 57% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Oxford decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #159 of 296
89%
Householder approved
Below avg (90%) #205 of 296
43%
Decided in 8 weeks
Below avg (63%) #261 of 296
57%
Extended time limit
Above avg (41%) #259 of 296
61%
Minor dwellings approved
64 decided (1-9 homes)
100%
Major dwellings approved
5 decided (10+ homes)
75%
Change of use approved
117 decided
1,150
Total decisions
140 refused in the year to March 2026