Shelton Farm Delabole Cornwall PL33 9DA Data via plota.co.uk
Proposal
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 91.
Documents 2
Application forms 1
Other documents 1
Site constraints 5
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in April 2016, the latest held for this property. The building may have changed since. View the certificate
Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.
Important details
Decision outlook
Day 91, past the statutory target. 85% of utility and infrastructure works in Cornwall are decided within thirteen weeks, which runs to 9 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.
Plota live figures for utility and infrastructure works decided by Cornwall in the last twelve months, from validation. Cornwall decision record →
Public comments
No public comments yet.
Last counted 7 Oct 2026
Consultation & key dates
- Statutory expiry
- 21 Aug 2026
- Env. assessment
- No
Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
Shelton Farm Delabole Cornwall PL33 9DA
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
