23/00482/DISA - Discharge of Conditions - 1st Submission Pending Consideration

Proposal

To discharge Condition 5 (surface water drainage) 6 (surface water run-off) 7 (biodiversity) 11 (contamination) 12 (remediation scheme) 15 (tree protection) 16 (soft landscaping) of decision dated 21 March 2024 for Proposed additional 6No.pitches for Gypsy/Travellers, with associated paddock, making 12No.pitches on site in total Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2025
✓
Consultation
13 Oct 2026
Decision
Target date was 30 Jan 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 27 Oct 2026; it is now day 456.

Comments are open until 27 Oct 2026

Comment on this application ↗

Documents 35

All documents on the council site ↗

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 5 awaiting decision

    • ConditionsTo discharge Condition 5 (surface water drainage) 6 (surface water run-off) 7 (biodiversity)…This application23/00482/DISA

Site constraints 4

Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 513 m away: Sunnica Energy Farm
The site is 513 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Kingsway Solar Farm (at pre-application, 1302 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 15 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Cambridgeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Conditions - 1st Submission
Postcode
CB25 0BH
Received
29 Jul 2025
Validated
29 Jul 2025
Ward
Burwell
Parish
Burwell
Case officer
Show
Target decision
30 Jan 2026
Applicant
Show
Agent
Peter Humphrey Associates Ltd

Decision outlook

Day 456, past the statutory target. 87% of discharge of conditions in East Cambridgeshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Oct 2026.

Day 456400 days past the 56-day target
68%decided within 8 weeks
94%approved
197decided in the last year

Plota live figures for discharge of conditions decided by East Cambridgeshire in the last twelve months, from validation. East Cambridgeshire decision record →

Public comments

No public comments yet.

Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14188457
Planning Portal ref
PP-14188457
Consultation
13 Oct 2026
Comments by
27 Oct 2026
Statutory expiry
23 Sept 2025
East Cambridgeshire
Planning Authority Score
6.1/10
Average
#97 of 296 councils
Relevant to this application:
Householder decisions

East Cambridgeshire is faster than most councils at deciding householder applications, ranking #65 out of 296. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Cambridgeshire decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #193 of 296
89%
Householder approved
Below avg (90%) #202 of 296
76%
Decided in 8 weeks
Above avg (63%) #65 of 296
34%
Extended time limit
Below avg (41%) #85 of 296
74%
Minor dwellings approved
124 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
87%
Change of use approved
30 decided
697
Total decisions
96 refused in the year to March 2026