Eastern Green, South Of A45, Coventry, CV5 7LG Data via plota.co.uk

PL/2025/0001658/DCA - DCA Approval of details reserved by condition Pending Consideration

Proposal

Submission of details to discharge condition No. 34 (drainage) for phase 4 only; imposed on planning permission reference granted on 20/11/2018 for Residential led development of up to 2400 dwellings, Including 'extra-care' accommodation; new vehicular access from the A45 and via Pickford Green Lane, with other non-vehicular access points; 15ha of employment land (B1, B2 and B8); a District Centre of approximately 10,000 sq.m. retail space; a Local Centre of approx. 1000 sq.m. local convenience retail plus other community facilities; provision of a Primary School; open spaces, substantial landscaping, green infrastructure and sports provision; earthworks including the provision of new drainage features; and associated demolition and groundworks. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Aug 2025
Decision
Target date was 22 Oct 2025

Under consideration

No decision has been issued yet. A decision is expected by 22 Oct 2025.

Documents 91

Statements & assessments 43

PDF Flood Risk Assessment - 9. Preliminary Drainage Proposals Drainage · 10 Aug 2026 View ↗ PDF Watercourse Land Drainage Consent Supporting information · 10 Aug 2026 View ↗ PDF Illustrative Surface Water Drainage Strategy DWG 10290-DR-03 Rev O Drainage · 10 Aug 2026 View ↗ PDF Remediation Method Statement - August 2025 Supporting information · 10 Aug 2026 View ↗ PDF S98 Flow Control Chamber Detail - LC/DC Link DWG 302 Rev C Drainage · 10 Aug 2026 View ↗ PDF Proposed Culvert Layout DWG 300 Rev E Drainage · 10 Aug 2026 View ↗ PDF S104 Basin Sections Basin 1 - LC/DC Link DWG 115 Rev B Drainage · 10 Aug 2026 View ↗ PDF S104 Drainage Layout - LC/DC Link DWG 110 Rev F Drainage · 10 Aug 2026 View ↗ PDF Drainage Maintenance Regime Drainage · 10 Aug 2026 View ↗ PDF S104 Drainage Layout PH4 Whole Site DWG 160 Rev B Drainage · 10 Aug 2026 View ↗ PDF S104 Flood Route Plan PH4 DWG 135 Rev A Drainage · 10 Aug 2026 View ↗ PDF Drainage Areas Plan - Surface Water DWG 130 Rev A Drainage · 10 Aug 2026 View ↗ PDF S104 Drainage Layout - PH4 - Sheet 3 of 3 DWG 117 Rev D Drainage · 10 Aug 2026 View ↗ PDF S104 Drainage Layout - PH4 - Sheet 2 of 3 DWG 116 Rev C Drainage · 10 Aug 2026 View ↗ PDF S104 Drainage Layout - PH4 - Sheet 1 of 3 DWG 115 Rev C Drainage · 10 Aug 2026 View ↗ PDF Remediation Method Statement Supporting information · 1 May 2026 View ↗ PDF Preliminary Drainage Proposals Supporting information · 1 May 2026 View ↗ PDF Illustrative Surface Water Drainage Strategy DWG 10290-DR-03 Rev O Drainage · 1 May 2026 View ↗ PDF S38/S104 SW Manhole Schedule - LC/DC Link DWG 320 Rev H Drainage · 1 May 2026 View ↗ PDF S98 Flow Control Chamber Detail - LD/DC Link DWG 302 Rev C Drainage · 1 May 2026 View ↗ PDF Proposed Culvert Layout DWG 300 Rev E Drainage · 1 May 2026 View ↗ PDF S104 Basin Sections Basin 1 LC-DC Link DWG 115 Rev B Drainage · 1 May 2026 View ↗ PDF S104 Drainage Layout LC/DC Link DWG 110 Rev F Drainage · 1 May 2026 View ↗ PDF Drainage Maintenance Regime Drainage · 1 May 2026 View ↗ PDF S104 Drainage Layout PH4 Whole Site DWG 160 Rev B Drainage · 1 May 2026 View ↗ PDF S104 Flood Route Plan PH4 DWG 135 Rev A Drainage · 1 May 2026 View ↗ PDF Drainage Areas Plan - Surface Water DWG 130 Rev A Drainage · 1 May 2026 View ↗ PDF S104 Drainage Layout PH4 Sheet 3 of 3 DWG 117 Rev D Drainage · 1 May 2026 View ↗ PDF S104 Drainage Layout PH4 Sheet 2 of 3 DWG 116 Rev C Drainage · 1 May 2026 View ↗ PDF S104 Drainage Layout PH4 Sheet 1 of 3 DWG 115 Rev C Drainage · 1 May 2026 View ↗ PDF FW Manhole Schedule Sheet 2 of 2 DWG 314 Drainage · 27 Aug 2025 View ↗ PDF FW Manhole Schedule Sheet 1 of 2 DWG 313 Drainage · 27 Aug 2025 View ↗ PDF SW Manhole Schedule Sheet 3 of 3 DWG 312 Drainage · 27 Aug 2025 View ↗ PDF SW Manhole Schedule Sheet 2 of 3 DWG 311 Drainage · 27 Aug 2025 View ↗ PDF SW Manhole Schedule Sheet 1 of 3 DWG 310 Drainage · 27 Aug 2025 View ↗ PDF S104 Construction Details DWG 305 Drainage · 27 Aug 2025 View ↗ PDF S104 Drainage Layout Sheet 3 of 3 DWG 117 Drainage · 27 Aug 2025 View ↗ PDF S104 Drainage Layout Sheet 2 of 3 DWG 116 Drainage · 27 Aug 2025 View ↗ PDF S104 Drainage Layout Sheet 1 of 3 DWG 115 Drainage · 27 Aug 2025 View ↗ PDF Basin Sections DWG 4-030 Rev A Drainage · 27 Aug 2025 View ↗ PDF Flood Route Plan DWG 4-016 Rev D Drainage · 27 Aug 2025 View ↗ PDF Storm Network 1 Calculations Drainage · 27 Aug 2025 View ↗ PDF Foul Network 1 Calculations Drainage · 27 Aug 2025 View ↗

Plans & drawings 38

PDF SFA6B Headwall 3 Sided Kee Klamp SFA1 300 Outfall Safety Grille Additional plans · 10 Aug 2026 View ↗ PDF SFA15B Headwall 3 Sided Kee Klamp SFA1 900 Outfall Safety Grille Additional plans · 10 Aug 2026 View ↗ PDF S38/S104 SW Manhole Schedule - LC/DC Link DWG 320 Rev H Additional plans · 10 Aug 2026 View ↗ PDF External works - Sheet 9 of 9 DWG 148 Rev C Additional plans · 10 Aug 2026 View ↗ PDF External works - Sheet 8 of 9 DWG 147 Rev C Additional plans · 10 Aug 2026 View ↗ PDF External works - Sheet 7 of 9 DWG 146 Rev C Additional plans · 10 Aug 2026 View ↗ PDF External works - Sheet 6 of 9 DWG 145 Rev C Additional plans · 10 Aug 2026 View ↗ PDF External works - Sheet 5 of 9 DWG 144 Rev C Additional plans · 10 Aug 2026 View ↗ PDF External works - Sheet 4 of 9 DWG 143 Rev C Additional plans · 10 Aug 2026 View ↗ PDF External works - Sheet 3 of 9 DWG 142 Rev C Additional plans · 10 Aug 2026 View ↗ PDF External works - Sheet 2 of 9 DWG 141 Rev B Additional plans · 10 Aug 2026 View ↗ PDF External works - Sheet 1 of 9 DWG 140 Rev B Additional plans · 10 Aug 2026 View ↗ PDF S38 General Arrangement - PH4 Sheet 3 of 3 DWG 112 Rev C Additional plans · 10 Aug 2026 View ↗ PDF S38 General Arrangement - PH4 Sheet 2 of 3 DWG 111 Rev C Additional plans · 10 Aug 2026 View ↗ PDF S38 General Arrangement - PH4 Sheet 1 of 3 DWG 110 Rev C Additional plans · 10 Aug 2026 View ↗ PDF Headwall 3 Sided Kee Klamp SFA1 300 Outfall Safety Grille Additional plans · 1 May 2026 View ↗ PDF Headwall SFA1 900 Outfall Safety Grille 3 Sided Kee Klamp Additional plans · 1 May 2026 View ↗ PDF External Works Sheet 9 of 9 DWG 148 Rev C Additional plans · 1 May 2026 View ↗ PDF External Levels Sheet 8 of 9 DWG 147 Rev C Additional plans · 1 May 2026 View ↗ PDF External Levels Sheet 7 of 9 DWG 146 Rev C Additional plans · 1 May 2026 View ↗ PDF External Levels Sheet 6 of 9 DWG 145 Rev C Additional plans · 1 May 2026 View ↗ PDF External Levels Sheet 5 of 9 DWG 144 Rev C Additional plans · 1 May 2026 View ↗ PDF External Levels Sheet 4 of 9 DWG 143 Rev C Additional plans · 1 May 2026 View ↗ PDF External Levels Sheet 3 of 9 DWG 142 Rev C Additional plans · 1 May 2026 View ↗ PDF External Levels Sheet 2 of 9 DWG 141 Rev B Additional plans · 1 May 2026 View ↗ PDF External Levels Sheet 1 of 9 DWG 140 Rev B Additional plans · 1 May 2026 View ↗ PDF General Arrangement Sheet 3 of 3 DWG 112 Rev C Additional plans · 1 May 2026 View ↗ PDF General Arrangement Sheet 2 of 3 DWG 111 Rev C Additional plans · 1 May 2026 View ↗ PDF General Arrangement Sheet 1 of 3 DWG 110 Rev C Additional plans · 1 May 2026 View ↗ PDF Highway Longsections Sheet 9 of 9 DWG 208 Additional plans · 27 Aug 2025 View ↗ PDF Highway Longsections Sheet 8 of 9 DWG 207 Additional plans · 27 Aug 2025 View ↗ PDF Highway Longsections Sheet 7 of 9 DWG 206 Additional plans · 27 Aug 2025 View ↗ PDF Highway Longsections Sheet 6 of 9 DWG 205 Additional plans · 27 Aug 2025 View ↗ PDF Highway Longsections Sheet 5 of 9 DWG 204 Additional plans · 27 Aug 2025 View ↗ PDF Highway Longsections Sheet 4 of 9 DWG 203 Additional plans · 27 Aug 2025 View ↗ PDF Highway Longsections Sheet 3 of 9 DWG 202 Additional plans · 27 Aug 2025 View ↗ PDF Highway Longsections Sheet 2 of 9 DWG 201 Additional plans · 27 Aug 2025 View ↗ PDF Highway Longsections Sheet 1 of 9 DWG 200 Additional plans · 27 Aug 2025 View ↗

All documents on the council site ↗

Associated applications 19

Site constraints 5

Public footpath 11 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Air quality management area: Coventry City-Wide AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Radon affected area, class 4; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Coventry - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Coventry
Application type
DCA Approval of details reserved by condition
Postcode
CV5 7LG
Received
27 Aug 2025
Validated
27 Aug 2025
Ward
Bablake
Parish
Allesley Parish Council
Case officer
Show
Target decision
22 Oct 2025
Decision level
Delegated decision
Applicant
Show
Agent
RCA Regeneration Ltd

Consultation & key dates

Statutory expiry
22 Oct 2025
Coventry
Planning Authority Score
7.7/10
Good
#35 of 296 councils
Relevant to this application:
Major dwellings

Coventry is one of the fastest councils in England for householder decisions, ranking #13 out of 296. Only 13% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Coventry decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #219 of 296
90%
Householder approved
Above avg (90%) #189 of 296
91%
Decided in 8 weeks
Above avg (63%) #13 of 296
13%
Extended time limit
Below avg (41%) #7 of 296
72%
Minor dwellings approved
114 decided (1-9 homes)
89%
Major dwellings approved
28 decided (10+ homes)
74%
Change of use approved
100 decided
1,131
Total decisions
186 refused in the year to March 2026