Land To The North West Of West Lynn Barrowford Road Colne Lancashire Data via plota.co.uk

25/0365/CND - Discharge Condition Registered

Proposal

Approval of Details Reserved by Condition: Discharge Condition 3 (Materials), Condition 4 (S106 Planning Obligation for BNG monitoring), Condition 5 (Landscaping Scheme), Condition 9 (External Lighting), Condition 11 (Surface Water Drainage), Condition 13 (Storage of Manure) and the BNG Condition of Planning Permission . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 May 2025
✓
Validated
21 Jul 2025
✓
Consultation
22 Jul 2025
Decision
Target date was 15 Sept 2025

Under consideration

No decision has been issued yet. A decision is expected by 15 Sept 2025.

The consultation period closed on 12 Aug 2025.

Site constraints 4

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 4; National infrastructure project: Calderdale Energy Park, at pre-application.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 16 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Pendle - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Pendle
Application type
Discharge Condition
Received
29 May 2025
Validated
21 Jul 2025
Ward
Vivary Bridge
Parish
Colne Town Council
Case officer
Show
Target decision
15 Sept 2025
Applicant
Show
Agent
Building Elements Ltd

Public comments

No public comments yet.

Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14058008
Planning Portal ref
PP-14058008
Consultation
22 Jul 2025
Comments by
12 Aug 2025
Statutory expiry
15 Sept 2025
Env. assessment
No
Pendle
Planning Authority Score
4.7/10
Below average
#166 of 296 councils
Relevant to this application:
Householder decisions

Pendle ranks #153 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Pendle decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #175 of 296
87%
Householder approved
Below avg (90%) #234 of 296
64%
Decided in 8 weeks
Above avg (63%) #153 of 296
34%
Extended time limit
Below avg (41%) #89 of 296
84%
Minor dwellings approved
95 decided (1-9 homes)
67%
Major dwellings approved
6 decided (10+ homes)
75%
Change of use approved
20 decided
441
Total decisions
58 refused in the year to March 2026