Wind Turbine West Of Aylesby Lane Aylesby North East Lincolnshire Data via plota.co.uk

DM/0549/26/CND - Discharge Condition Pending Consideration

Proposal

Details in discharge of Condition 7 (Landscaping and Ecology) pursuant to Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Jul 2026
✓
Consultation
29 Jul 2026
Decision
Expected by 15 Sept 2026

Under consideration

No decision has been issued yet. A decision is expected by 15 Sept 2026.

The consultation period closed on 22 Aug 2026.

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 7 awaiting decision

    • ConditionsDetails in discharge of Condition 7 (Landscaping and Ecology)This applicationDM/0549/26/CND

Site constraints 2

National infrastructure project: Hornsea Offshore Wind Farm (Zone 4) - Project Two
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, the site is inside its boundary); Viking CCS Pipeline (decided, 1481 m); Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) (at pre-application, the site is inside its boundary); Grimsby to Walpole (at pre-application, the site is inside its boundary); H2East Pipeline: Humber to Nottinghamshire (at pre-application, 1424 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge Condition
Received
21 Jul 2026
Validated
21 Jul 2026
Ward
Wold
Case officer
Show
Target decision
15 Sept 2026

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15069628
Planning Portal ref
PP-15069628
Consultation
29 Jul 2026
Comments by
22 Aug 2026
Statutory expiry
15 Sept 2026
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026