Myrtle House Sulgrave Road, London, W6 7QG Data via plota.co.uk

P/2026/01679/DET - Details to Meet Conditions Full/Outline Approved

Proposal

Submission of details and samples of the terrace screening to the third floor level, pursuant to Condition 7; details of the installation/commissioning reports of the Zero Emission MCS certified Air/Water Source Heat Pumps or Electric boilers, pursuant to Condition 10; details of the full postal address of the residential unit, pursuant to Condition 11; and details of parking permit restrictions, pursuant to Condition 13 of the planning permission reference: dated 7th July 2022. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jul 2026
✓
Validated
2 Jul 2026
✓
Approved
27 Aug 2026

Approved on 27 Aug 2026 · Last checked 21 Sept 2026

Associated applications 2

  • Part of

    Fullcouncil archive

    Conditions details submitted for 7, 10, 11, 13

    • ConditionsSubmission of details and samples of the terrace screening to the third floor level, pursuant…This applicationP/2026/01679/DET

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Melrose conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 730 m away: Thames Tideway Tunnel
The site is 730 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Details to Meet Conditions Full/Outline
Postcode
W6 7QG
Received
1 Jul 2026
Validated
2 Jul 2026
Ward
Addison
Case officer
Show
Decision
Application Approved
Decision date
27 Aug 2026
Applicant
Show

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
13 Jul 2026
Comments by
3 Aug 2026
Statutory expiry
27 Aug 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Major dwellings

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026