Layden Court Nursing Home All Hallows Drive Maltby Data via plota.co.uk

RB2026/1402 Invalid

Proposal

Application to determine whether Prior Notification is required for the installation of Solar Photovoltaics (PV) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Oct 2026
Decision
Expected by 27 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 31 Oct 2026 and 7 Nov 2026, from Rotherham's recent prior approvals.

Site constraints 6

National infrastructure project: Knottingley Power Project
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Inside the Maltby built-up area; Green belt 51 m away: South and West Yorkshire; Priority habitat 41 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 18 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rotherham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rotherham
Received
2 Oct 2026
Ward
Hellaby & Maltby West Ward
Parish
Maltby
Decision level
Proposed to be Delegated

Decision outlook

Day 26 of the 56-day target. Rotherham usually decides prior approvals by day 32.

Day 2630 days to the 56-day target
98%decided within 8 weeks
87%approved
58decided in the last year

Plota live figures for prior approvals decided by Rotherham in the last twelve months, from validation. Rotherham decision record →

Rotherham
Planning Authority Score
4.7/10
Below average
#167 of 296 councils
Relevant to this application:
Householder decisions

Rotherham ranks #107 out of 296 councils for householder decision speed. Rotherham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 71% approved vs 90% nationally.

One of the strictest councils
only 71% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Rotherham decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #266 of 296
71%
Householder approved
Below avg (90%) #295 of 296
72%
Decided in 8 weeks
Above avg (63%) #107 of 296
32%
Extended time limit
Below avg (41%) #68 of 296
78%
Minor dwellings approved
63 decided (1-9 homes)
100%
Major dwellings approved
20 decided (10+ homes)
83%
Change of use approved
58 decided
750
Total decisions
156 refused in the year to March 2026