Ashmere Worksop Road Aston 9999 Data via plota.co.uk

RB2026/0295 Approved

Proposal

Reconfiguration of bungalow including the erection of a single storey rear extension & alterations to roof Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Feb 2026
✓
Approved
15 Apr 2026

Approved on 15 Apr 2026 · Delegated (Part 2A) · Last checked 23 Sept 2026

Site constraints 4

Public footpath about 6 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
National infrastructure project about 993 m away: Whitestone Solar Farm
The site is about 993 m from the project boundary. Generating station, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area; Inside the Swallownest and Aston built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rotherham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rotherham
Received
27 Feb 2026
Validated
27 Feb 2026
Ward
Aston & Todwick Ward
Parish
Aston Cum Aughton
Decision
GRANTED CONDITIONALLY
Decision date
15 Apr 2026
Decision level
Delegated (Part 2A)

How this decision compares

Decided in 47 days from validation, about the council's usual 49 days. Approved, as 89% of extensions here are.

81%decided within 8 weeks
89%approved
403decided in the last year

Plota live figures for extensions decided by Rotherham in the last twelve months, from validation. Rotherham decision record →

Consultation & key dates

Consultation
3 Mar 2026
Comments by
31 Mar 2026
Rotherham
Planning Authority Score
4.7/10
Below average
#167 of 296 councils
Relevant to this application:
Householder decisions

Rotherham ranks #107 out of 296 councils for householder decision speed. Rotherham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 71% approved vs 90% nationally.

One of the strictest councils
only 71% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Rotherham decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #266 of 296
71%
Householder approved
Below avg (90%) #295 of 296
72%
Decided in 8 weeks
Above avg (63%) #107 of 296
32%
Extended time limit
Below avg (41%) #68 of 296
78%
Minor dwellings approved
63 decided (1-9 homes)
100%
Major dwellings approved
20 decided (10+ homes)
83%
Change of use approved
58 decided
750
Total decisions
156 refused in the year to March 2026