Former Cowbridge Police Station Data via plota.co.uk

2026/00786/LBC - Listed Building Consent application Awaiting Consultation Responses

Proposal

Internal alterations to facilitate energy efficiency improvements comprising the installation of secondary glazing to all windows, lowered ceilings and internal wall insulation to Flats 2 and 3, including the insulation and protective encasement of existing coving, together with minor alterations to the size and position of storage cupboards and associated ancillary works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Oct 2026
Decision
Expected by 15 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 13 Dec 2026 and 22 Dec 2026, from Glamorgan's recent extensions.

Comments are open until 17 Nov 2026

Comment on this application ↗

Site constraints 3

Grade II listed: Police Station
List entry 22293 · 13 m away · 7 more listed buildings within 150 m (7 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 7 with distances
Cadw ↗
Cowbridge conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 28 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Glamorgan - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Glamorgan
Application type
Listed Building Consent application
Received
20 Oct 2026
Validated
20 Oct 2026
Ward
Cowbridge
Parish
Cowbridge with Llanblethian Town Council
Case officer
Show
Target decision
15 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
Amity Planning

Decision outlook

Day 9 of the 56-day target. Glamorgan usually decides extensions by day 56.

Day 947 days to the 56-day target
51%decided within 8 weeks
91%approved
334decided in the last year

Plota live figures for extensions decided by Glamorgan in the last twelve months, from validation. Glamorgan decision record →

Consultation & key dates

Comments by
17 Nov 2026