17 Bettridge Road, London, SW6 3QH Data via plota.co.uk

P/2026/02114/HH REGISTERED: Under Consultation

Proposal

Erection of 1.7m high obscure glazed screening on top of the flat roof of existing second floor back addition, in connection with its use as a roof terrace; installation of new French door following the removal of existing French door and Juliette balcony to the rear elevation at second floor level, to provide access to the proposed roof terrace. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
1 Sept 2026
Decision
Expected by 27 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 27 Oct 2026 and 12 Nov 2026, from Hammersmith and Fulham's recent extensions. Comments are open until 29 Sept 2026.

Comment on this application ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Conservation area 17 m away: Hurlingham
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
2 listed buildings within 150 m; Inside the Hammersmith and Fulham built-up area; Metropolitan Open Land 84 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
SW6 3QH
Received
1 Sept 2026
Validated
1 Sept 2026
Ward
Palace And Hurlingham
Case officer
Show
Applicant
Show

Decision outlook

Day 11 of the 56-day target. Hammersmith and Fulham usually decides extensions by day 65.

Day 1154 days to the predicted decision (day 65)
44%decided within 8 weeks
98%approved
244decided in the last year

Plota live figures for extensions decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
1 Sept 2026
Comments by
29 Sept 2026
Statutory expiry
27 Oct 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026