Land Adjacent Mablethorpe Primary Academy Tuplin Road Mablethorpe Lincolnshire Data via plota.co.uk

01289/26/FUL - Full Planning Permission Awaiting decision

Proposal

Planning Permission - Erection of a Drive thru coffee shop with associated parking and landscaping. Erection of a 4no. bay jet wash facility with waiting area and vacuum areas and 2no. EV bays with associated substations and cabinets. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
✓
Validated
5 Oct 2026
✓
Consultation
16 Oct 2026
Decision
Expected by 30 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 24 Nov 2026 and 10 Dec 2026, from East Lindsey's recent commercial and major works.

Comments are open until 6 Nov 2026

Comment on this application ↗

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Inside the Mablethorpe built-up area; National infrastructure project about 987 m away: Eastern Green Link 3 and Eastern Green Link 4, at pre-application; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
7 Aug 2026
Validated
5 Oct 2026
Ward
Mablethorpe Ward
Parish
Mablethorpe & Sutton
Case officer
Show
Target decision
30 Nov 2026
Applicant
Show
Agent
P Architects Ltd

Decision outlook

Day 23 of the 56-day target. East Lindsey usually decides commercial and major works by day 56.

Day 2333 days to the 56-day target
52%decided within 8 weeks
96%approved
72decided in the last year

Plota live figures for commercial and major works decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

No public comments yet.

12 neighbours consulted · Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15092453
Planning Portal ref
PP-15092453
Neighbours
16 Oct 2026
Consultation
16 Oct 2026
Comments by
6 Nov 2026
Statutory expiry
30 Nov 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026