Land and Buildings to the Rear of 51, High Street, Wrestlingworth, Sandy, SG19 2EP Data via plota.co.uk

CB/26/00662/VOC - Variation of Condition Approved

Proposal

Variation of condition number 2 of planning permission (Demolition of redundant outbuildings and construction of new dwelling with carport and garden store) Variation sought to approved plans for the fenestration Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Feb 2026
✓
Validated
10 Mar 2026
✓
Approved
30 Apr 2026

Approved on 30 Apr 2026 · Last checked 13 Oct 2026

Associated applications 3

  • Part of

    Fullcouncil archive

    Conditions variation sought for 2

Site constraints 4

12 listed buildings within 150 m of the postcode pin
Nearest: The Chequers Inn, Grade II, about 57 m from the postcode pin · 1 Grade I, 11 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 12 with distances
Historic England ↗
Conservation area about 23 m away: Wrestlingworth Conservation Area
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
Inside the Wrestlingworth built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Variation of Condition
Postcode
SG19 2EP
Received
27 Feb 2026
Validated
10 Mar 2026
Parish
Wrestlingworth/Cockayne Hatley
Case officer
Show
Target decision
5 May 2026
Decision
Variation of Condition - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). 2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. 3 )It is recommended that the NatureSpace Best Practice Principles are taken into account and implemented where possible and appropriate.It is recommended that the NatureSpace Best Practice Principles are taken into account and implemented where possible and appropriate. 4 )It is essential to note that any works or activities whatsoever undertaken on site (including ground investigations, site preparatory works or ground clearance) prior to receipt of the written authorisation from the planning authority which permits the development to proceed under the District Licence (WML-OR152, or a 'Further Licence') are not licensed under the great crested newt District Licence. Any such works or activities have no legal protection under the great crested newt District Licence and if offences against great crested newt are thereby committed then criminal investigation and prosecution by the police may follow.It is essential to note that any works or activities whatsoever undertaken on site (including ground investigations, site preparatory works or ground clearance) prior to receipt of the written authorisation from the planning authority which permits the development to proceed under the District Licence (WML-OR152, or a 'Further Licence') are not licensed under the great crested newt District Licence. Any such works or activities have no legal protection under the great crested newt District Licence and if offences against great crested newt are thereby committed then criminal investigation and prosecution by the police may follow. 5 )The applicant should address the following points when submitting details to discharge condition 4: 1) The flood map for planning shows the main development area as flood zone 1, however, access is within Flood Zone 3, therefore, we will require details for safe access/egress during flood events. 2) We will require a full set of calculations providing evidence of all surface water retained on site for the (minimum) 1 in 30+10% Urban Creep. Any exceedance should be shown with pathways, depths and velocity. This should show existing property is not increased in flood risk. 3) Calculation should be carried out to measure the volume that will be displaced and show how this will be stored/not adversely affect other property. 4) We will require full drainage drawings showing all connections, control features, storage, inverts etc.� 5) We will require BRE365 infiltration test results. It is noted that attenuation before discharge into the existing pipework may be required, cleaning and condition report of existing pipework will be required in this case. 6) All surface water storage units within flood zones should be bound so as to be impervious to flood water, anchored (as per manufacturers instruction) and vents protected from flood water entering.� 7) There should be a minimum 1m between the base of a soakage unit and the seasonal water table. 8) The connection of private surface water drainage systems to a highway system is not permitted. 9) Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 10) The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 11) The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).The applicant should address the following points when submitting details to discharge condition 4: 1) The flood map for planning shows the main development area as flood zone 1, however, access is within Flood Zone 3, therefore, we will require details for safe access/egress during flood events. 2) We will require a full set of calculations providing evidence of all surface water retained on site for the (minimum) 1 in 30+10% Urban Creep. Any exceedance should be shown with pathways, depths and velocity. This should show existing property is not increased in flood risk. 3) Calculation should be carried out to measure the volume that will be displaced and show how this will be stored/not adversely affect other property. 4) We will require full drainage drawings showing all connections, control features, storage, inverts etc.� 5) We will require BRE365 infiltration test results. It is noted that attenuation before discharge into the existing pipework may be required, cleaning and condition report of existing pipework will be required in this case. 6) All surface water storage units within flood zones should be bound so as to be impervious to flood water, anchored (as per manufacturers instruction) and vents protected from flood water entering.� 7) There should be a minimum 1m between the base of a soakage unit and the seasonal water table. 8) The connection of private surface water drainage systems to a highway system is not permitted. 9) Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 10) The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 11) The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 6 )The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. 7 )The applicant is advised that the storage of materials associated with the construction of this development should take place within the site and not extend into or within the public highway without authorisation from the highway authority. If necessary the applicant should contact the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301.The applicant is advised that the storage of materials associated with the construction of this development should take place within the site and not extend into or within the public highway without authorisation from the highway authority. If necessary the applicant should contact the Streetworks Manager, Central Bedfordshire Council, by contacting the Highways Helpdesk 0300 300 8301. 8 )The applicant is advised that while the Council has no reason to believe this site is contaminated, and is not aware of any potentially contaminative past use, it is the developer's responsibility to ensure that final ground conditions are fit for the end use of the site. If during any site investigation, excavation, engineering or construction works evidence of land contamination is identified, the applicant shall notify the Local Planning Authority without delay. Any land contamination identified shall be remediated to the satisfaction of the Local Planning Authority to ensure that the site is made suitable for its end use.The applicant is advised that while the Council has no reason to believe this site is contaminated, and is not aware of any potentially contaminative past use, it is the developer's responsibility to ensure that final ground conditions are fit for the end use of the site. If during any site investigation, excavation, engineering or construction works evidence of land contamination is identified, the applicant shall notify the Local Planning Authority without delay. Any land contamination identified shall be remediated to the satisfaction of the Local Planning Authority to ensure that the site is made suitable for its end use. 9 )The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice.The applicant is advised where roofing work or timber treatment is to be undertaken it is the legal responsibility of the contractor to check for bats. If bats are found during the course of any work to buildings or trees where not previously anticipated, then works should immediately stop and Natural England notified for appropriate advice. 10 )The existing outbuildings provide opportunities for roosting birds and evidence of previous nesting was found onsite. Development of the site should therefore take place outside of the bird nesting season (March to August). If this is not possible, then it is recommended that a suitably qualified ecologist is present on-site during any vegetation clearance. If an occupied nest is found onsite, then a buffer zone around the nest would be required until the nest is no longer in use.The existing outbuildings provide opportunities for roosting birds and evidence of previous nesting was found onsite. Development of the site should therefore take place outside of the bird nesting season (March to August). If this is not possible, then it is recommended that a suitably qualified ecologist is present on-site during any vegetation clearance. If an occupied nest is found onsite, then a buffer zone around the nest would be required until the nest is no longer in use.
Decision date
30 Apr 2026

Public comments

No public comments yet.

Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
10 Mar 2026
Comments by
17 Apr 2026
Site or press notice
27 Mar 2026
Central Bedfordshire
Planning Authority Score
6.3/10
Average
#88 of 296 councils
Relevant to this application:
Householder decisions

Central Bedfordshire is faster than most councils at deciding householder applications, ranking #62 out of 296. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Central Bedfordshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #218 of 296
91%
Householder approved
Above avg (90%) #169 of 296
76%
Decided in 8 weeks
Above avg (63%) #62 of 296
35%
Extended time limit
Below avg (41%) #99 of 296
61%
Minor dwellings approved
153 decided (1-9 homes)
86%
Major dwellings approved
29 decided (10+ homes)
73%
Change of use approved
45 decided
1,444
Total decisions
226 refused in the year to March 2026