The Meads Open Space (Site 1) The Meads Edgware HA8 Data via plota.co.uk
Description
Submission of details of general condition of planning permission Biodiversity Gain Plan to planning permission dated 27/04/2026 Data via plota.co.uk
Last checked
Associated applications 3
- ConditionsSubmission of details of general condition of planning permission Biodiversity Gain PlanThis application26/3000/BNG
Show 1 more · 1 pending
Site constraints 5
Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Barnet - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
39 Oldberry Road Edgware HA8 9DA
Single storey rear extension with 2no. rooflights (amended description)
Menorah Grammar School Abbots Road Edgware HA8 0QS
1 x Oak (applicants ref. T1) - Reduce by 3-4m, remove deadwood.
70 Dryfield Road Edgware HA8 9JT
1 x Sycamore - (applicants ref. T1) Fell to ground level.
5 Mostyn Road Edgware HA8 0JB
Installation of roof-mounted photovoltaic (PV) solar panels to rear elevation. A...
26 Walter Walk Edgware HA8 9ES
1 x Eucalyptus - Crown lift up to 3 metres for clearance and cut back from prope...
6 Mostyn Road Edgware HA8 0JD
Impermeable surface with surface water discharge and vehicle access to provide o...
Barnet is faster than most councils at deciding householder applications, ranking #42 out of 296. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Barnet is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.
Referenced application
Council archive
The Meads Open Space (Site 1) The Meads Edgware HA8
Re-alignment of the watercourse including two sections of two-staged channels along the southern bank of the brook, two raised earth mounds in the south-east corner of the site, new tree planting
- Received
- 8 Aug 2025
- Outcome
- Pending
