Barn South Of Farthings Church Road Tasburgh Norfolk Data via plota.co.uk

2026/2810 - Full Pending Consideration

Proposal

Proposed new dwelling following Class Q approval for a Barn Conversion Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2026
✓
Validated
6 Oct 2026
✓
Consultation
9 Oct 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 22 Dec 2026 and 5 Jan 2027, from South Norfolk Broadland's recent changes of use.

Comments are open until 30 Oct 2026

Comment on this application ↗

Site constraints 8

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Priority habitat: No main habitat but additional habitats present
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Scheduled monument 25 m away: Camp in village
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
National infrastructure project 553 m away: East Pye Solar
The site is 553 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
3 listed buildings within 150 m; Inside the Tasburgh built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 10 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR15 1ND
Received
18 Sept 2026
Validated
6 Oct 2026
Ward
Hempnall
Parish
Tasburgh
Target decision
1 Dec 2026
Applicant
Show
Agent
Howe and Boosey Architectural Services ltd

Decision outlook

Day 22 of the 56-day target. South Norfolk Broadland usually decides changes of use by day 84.

Day 2262 days to the predicted decision (day 84)
23%decided within 8 weeks
83%approved
96decided in the last year

Plota live figures for changes of use decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

9 neighbours consulted · Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15234838
Planning Portal ref
PP-15234838
Neighbours
9 Oct 2026
Consultation
9 Oct 2026
Comments by
30 Oct 2026
Statutory expiry
1 Dec 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026