5 Hilton Road Ipswich Suffolk IP3 9RQ Data via plota.co.uk

26/00579/FUL - Full Application Pending Consideration

Proposal

Erection of a single-storey rear and side extension. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Aug 2026
✓
Validated
7 Sept 2026
Decision
Expected by 2 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Oct 2026, from Ipswich's recent extensions.

The consultation period closed on 28 Sept 2026.

Site constraints 2

Also on the record
Radon affected area, class 2; Inside the Ipswich built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area70 m² (753 sq ft)
Energy ratingC (71 out of 100)
PropertyEnd-terrace house, 4 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsCavity wall, with external insulation

From the energy performance certificate lodged in June 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Ipswich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ipswich
Application type
Full Application
Postcode
IP3 9RQ
Received
3 Aug 2026
Validated
7 Sept 2026
Ward
PRIORY HEATH
Case officer
Show
Target decision
2 Nov 2026
Applicant
Show

Decision outlook

Day 51 of the 56-day target. Ipswich usually decides extensions by day 51.

Day 515 days to the 56-day target
79%decided within 8 weeks
95%approved
194decided in the last year

Plota live figures for extensions decided by Ipswich in the last twelve months, from validation. Ipswich decision record →

Consultation & key dates

Consultation
7 Sept 2026
Comments by
28 Sept 2026
Site or press notice
15 Sept 2026
Ipswich
Planning Authority Score
7.6/10
Good
#38 of 296 councils
Relevant to this application:
Householder decisions

Ipswich is faster than most councils at deciding householder applications, ranking #67 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Ipswich decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #40 of 296
98%
Householder approved
Above avg (90%) #18 of 296
76%
Decided in 8 weeks
Above avg (63%) #67 of 296
38%
Extended time limit
Below avg (41%) #129 of 296
81%
Minor dwellings approved
27 decided (1-9 homes)
100%
Major dwellings approved
5 decided (10+ homes)
82%
Change of use approved
62 decided
429
Total decisions
27 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.